
6.1 Installation checklist
Installation includes the following activities:
Installation Task
1.
Plan your system.
2. Obtain all required equipment and tools.
3.
Site all equipment.
4.
Route all cables.
5. Drill cable and mounting holes.
6. Make all connections into equipment.
7.
Secure all equipment in place.
8. Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any installation. It is also useful for any future
additions or maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
Tools required
Product installation requires the following tools:
Item
Description
Quantity
Power drill
1
Pozidrive screwdriver
1
22
Summary of Contents for RMK-10
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 14: ...14 ...
Page 15: ...Chapter 3 Parts supplied Chapter contents 3 1 Parts supplied on page 16 Parts supplied 15 ...
Page 21: ...Chapter 6 Installation Chapter contents 6 1 Installation checklist on page 22 Installation 21 ...
Page 34: ...34 ...
Page 42: ...42 ...
Page 50: ...50 ...
Page 54: ......
Page 56: ...W Warranty 48 Water ingress 46 WEEE Directive 8 ...
Page 57: ......