Chapter 5: Installation
5-11
5.6 Cable Running
Introduction
The minimum requirements are a power cable and a connection from the
associated GPS Antenna. Additional cables will be required if you are
connecting to other equipment.
Consider the following points before installing the system cables:
• All cables should be adequately cleated and protected from physical
damage and exposure to heat. Avoid running cables through bilges or
doorways, or close to moving or hot objects.
• Where a cable passes through an exposed bulkhead or deckhead, a
watertight gland or swan neck tube should be provided.
• If an extension is required for the antenna cable it should be limited to a
single extension and kept as short as possible to minimise any signal
loss.
• The antenna cable should not be run close to any VHF antenna feeds.
Cross coupling between the cables may result in interference of the
GPS receiver and possible reduction in performance.
Connectors
Run the following cables from the connectors provided at the rear of the
plotter as shown in
Figure 5-6
:
•
ANTENNA
, for connection to the associated GPS antenna.
•
PWR/NMEA
, for DC power and NMEA inputs/outputs.
•
SeaTalk
, using the dedicated SeaTalk connector.
Figure 5-6: Raynav 300 Rear Connector Panel
PWR/NMEA
SeaTalk
Antenna
D5847-1
Summary of Contents for Raynav 300 GPS Plotter
Page 1: ...Raynav 300 GPS Plotter Owner s Handbook Document Number 81171_5 Date September 2002...
Page 2: ......
Page 28: ...2 10 Raynav 300 GPS Plotter...
Page 78: ...3 50 Raynav 300 GPS Plotter...
Page 94: ...4 16 Raynav 300 GPS Plotter...
Page 110: ...5 16 Raynav 300 GPS Plotter...
Page 114: ...6 4 Raynav 300 GPS Plotter...
Page 120: ...C 2 Raynav 300 GPS Plotter...
Page 122: ......
Page 124: ...T 2 Raynav 300 Plotter...
Page 126: ...T 4 Raynav 300 GPS Plotter...
Page 132: ...xvi...
Page 136: ......