
3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any
installation. It is also useful for any future additions or
maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
3.2 Pack contents
All models contain the following items:
1
2
3
4
5
6
7
8
D12098-1
Number
Description
1.
p70 / p70R Pilot controller (p70 8 button controller is
shown in diagram above.)
2.
Bezel
3.
Gasket
4.
Suncover
5.
4 x fixing screws
6.
Document pack
7.
SeaTalk
ng
Blanking plug
8.
SeaTalk
ng
Spur Cable
Unpack the pilot controller unit carefully to prevent damage.
Save the carton and packing in case the unit has to be returned
for service.
14
p70 / p70R
Summary of Contents for P70
Page 2: ......
Page 4: ......
Page 12: ...12 p70 p70R...
Page 22: ...22 p70 p70R...
Page 28: ...28 p70 p70R...
Page 29: ...Chapter 5 Mounting Chapter contents 5 1 Mounting on page 30 Mounting 29...
Page 36: ...36 p70 p70R...
Page 44: ...44 p70 p70R...
Page 62: ...62 p70 p70R...
Page 68: ...68 p70 p70R...
Page 85: ...Chapter 13 Troubleshooting Chapter contents 13 1 Troubleshooting on page 86 Troubleshooting 85...
Page 90: ...90 p70 p70R...
Page 103: ......
Page 104: ...www raymarine com...