Sharing a breaker
Where more than 1 piece of equipment shares a breaker you
must provide protection for the individual circuits. E.g. by
connecting an in-line fuse for each power circuit.
D11637-2
2
4
4
1
3
+
-
1
Positive (+) bar
2
Negative (-) bar
3
Circuit breaker
4
Fuse
Where possible, connect individual items of equipment to
individual circuit breakers. Where this is not possible, use
individual in-line fuses to provide the necessary protection.
Warning: Product grounding
Before applying power to this product, ensure it has
been correctly grounded, in accordance with the
instructions in this guide.
4.4 SeaTalk
ng
connection
The unit connects as part of a SeaTalk
ng
network.
Example: SeaTalk
ng
Evolution system with iTC-5
12 V dc
0
0
SeaT
alk
ng
SeaTalk
ng
D13026-1
2
7
1
3
4
5
6
8
9
1
0
1
1
1
ACU unit
2
2 x Instruments
3
p70 / p70R Pilot controller
4
Vessel’s 12 V dc power supply
5
EV unit
6
SeaTalk
ng
5–way connector
7
Rudder reference transducer
8
iTC-5 converter
9
Depth transducer
10
Wind transducer
11
Speed transducer
Note:
In the above example if an ACU-100 was used, the
SeaTalk
ng
network would require a dedicated 12 V dc power
26
p70 / p70R
Summary of Contents for P70
Page 2: ......
Page 4: ......
Page 12: ...12 p70 p70R...
Page 22: ...22 p70 p70R...
Page 28: ...28 p70 p70R...
Page 29: ...Chapter 5 Mounting Chapter contents 5 1 Mounting on page 30 Mounting 29...
Page 36: ...36 p70 p70R...
Page 44: ...44 p70 p70R...
Page 62: ...62 p70 p70R...
Page 68: ...68 p70 p70R...
Page 85: ...Chapter 13 Troubleshooting Chapter contents 13 1 Troubleshooting on page 86 Troubleshooting 85...
Page 90: ...90 p70 p70R...
Page 103: ......
Page 104: ...www raymarine com...