Chapter 6: Installation
95
If your Raytheon equipment is going to be connected to other equipment
using a cable not supplied by Raytheon, a suppression ferrite MUST
always be fitted to the cable close to the Raytheon unit.
Planning the Installation
Before you install your system, you should spend some time planning
the installation, giving consideration to:
• Location
– Siting the display unit for ease of use
– Providing access for servicing the equipment
Section 6.3 provides further details regarding location of the display unit.
• Integrated Systems
– What other instruments need to be connected to your chartplotter
– How do these instruments interface to the chartplotter (Seatalk,
NMEA and/or HSB)
Section 6.4 provides information on these interface and defines the data
that can be transferred via SeaTalk and NMEA.
• Cable runs
– What cables, in addition to the power cable, are required
– Cables must be run to avoid physical damage, exposure to heat
and acute bends
Section 6.5 provides cable details, including recommended lengths.
The remaining sections of this chapter cover the following topics:
• Unpacking and inspecting the components
• Location of the Display Unit
• Integrated Systems
• Cable Runs
• Mounting the Display Unit
• HSB Series System Connections
• System Check and Initial System Set Up
Planning the
Installation
Summary of Contents for HSB Chartplotter
Page 2: ...HSB Series Chartplotter owner s handbook Document number 81150_1 Date 18th September 1998...
Page 3: ......
Page 7: ...HSB Series Chartplotter iv...
Page 15: ...HSBSeriesChartplotter xii...
Page 46: ...Chapter2 GettingStarted 31...
Page 47: ...32 HSBSeriesChartplotter...
Page 57: ...42 HSBSeriesChartplotter...
Page 133: ...116 HSBSeriesChartplotter...
Page 139: ...122 HSB Series Chartplotter...
Page 154: ......