5.1 Before powering up
Before proceeding with the power on test of your system you must
ensure that:
• Radar and all ancillary equipment has been installed and
connected in accordance with the manufacturers’ instructions.
• All G-Series equipment has been installed and connected in
accordance with the G-Series installation instructions.
5.2 Power up test
It is advisable to perform an initial power-up test to help ensure
that the system is wired correctly.
Perform the following initial checks before proceeding to operate
or configure the system:
Turn on breakers
Turn on the power to the equipment at the distribution panel:
1.
Monitors and ancillary equipment.
2.
GPM processor units.
Power up sequence
: Power up the monitors first to allow the
boot sequence and start-up information to be shown at the master
monitors.
Check system
Wait for 2 minutes whilst the boot sequence is completed, then
check each of the following:
• Monitors.
• Keyboards.
• GPM processors units.
• GVM video modules.
• SeaTalk
hs
switch.
• DSM sounder module (refer to separate instructions supplied with
the DSM).
Monitor checks
You will need to select the appropriate input on each monitor. On a
G-Series monitor:
• Press the power key (if required).
• Press the Left / Right arrow keys to scroll through the inputs.
On a Glass Bridge monitor, use the keyboard to scroll through the
inputs.
96
G-Series installation instructions
Summary of Contents for G-Series system
Page 1: ...G Series system Installation instructions...
Page 2: ......
Page 4: ......
Page 8: ...8 G Series installation instructions...
Page 14: ...14 G Series installation instructions...
Page 98: ...98 G Series installation instructions...
Page 124: ...124 G Series installation instructions...
Page 142: ...142 G Series installation instructions...
Page 146: ...146 G Series installation instructions...
Page 158: ...158 G Series installation instructions...
Page 180: ...www raymarine com...