1.
Vessel’s longitudinal axis.
7.4 Location requirements — ACU
The installation location must take into account the following requirements:
• ACU-200, ACU-300, ACU-400 — install below decks in a dry area.
• ACU-100, ACU-150 — install above or below decks.
• The unit should be mounted on a vertical surface.
• The unit should be located as close to the battery as practical.
• Choose a location where the unit will be safe from physical damage and excessive vibration.
• Choose a location where the unit will not be subjected to a load or force.
• Mount away from any source of heat or potential flammable hazards, such as fuel vapor.
• The unit should be mounted in a location where the diagnostics LED is viewable.
43
Summary of Contents for Evolution EV-1
Page 2: ......
Page 4: ......
Page 34: ...Item Description Quantity 4 Mounting screws 2 5 Document pack 1 34...
Page 36: ...5 1 Dimensions EV 1 and EV 2 36...
Page 37: ...5 2 Dimensions ACU 100 ACU 150 Product dimensions 37...
Page 38: ...5 3 Dimensions ACU 200 ACU 300 ACU 400 38...
Page 54: ...54...
Page 66: ...66...
Page 80: ...Item Wire color ACU 100 ACU 150 1 Red 2 Blue 3 Green 4 Gray screen 80...
Page 82: ...82...
Page 104: ...104...
Page 114: ...114...
Page 128: ...128...
Page 134: ...134...
Page 138: ......
Page 141: ......