6.1 Installation checklist
Installation includes the following activities:
Installation Task
1.
Plan your system.
2. Obtain all required equipment and tools.
3.
Site all equipment.
4.
Route all cables.
5. Drill cable and mounting holes.
6. Make all connections into equipment.
7.
Secure all equipment in place.
8. Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any installation. It is also useful for any future
additions or maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
40
Summary of Contents for E70096
Page 2: ......
Page 4: ......
Page 34: ...Item Description Quantity 4 Mounting screws 2 5 Document pack 1 34 ...
Page 36: ...5 1 Dimensions EV 1 and EV 2 36 ...
Page 37: ...5 2 Dimensions ACU 100 ACU 150 Product dimensions 37 ...
Page 38: ...5 3 Dimensions ACU 200 ACU 300 ACU 400 38 ...
Page 54: ...54 ...
Page 66: ...66 ...
Page 80: ...Item Wire color ACU 100 ACU 150 1 Red 2 Blue 3 Green 4 Gray screen 80 ...
Page 82: ...82 ...
Page 104: ...104 ...
Page 114: ...114 ...
Page 128: ...128 ...
Page 134: ...134 ...
Page 138: ......
Page 141: ......