3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
3.2 Parts supplied
The parts supplied with your product are shown below.
00
0
0
0
0
0
1
2
3
6
8
9
4
5
7
1
0
D12686-1
1
Display cradle.
2
Display.
3
Transducer (including fitted transducer / power cable
not shown).
4
Cradle securing bolt.
5
Documentation pack.
6
Escutcheon and 2 x mounting screws (for through
transom cable installation).
7
Display cradle base.
8
3 x transducer bracket mounting screws.
9
3 x p-clips and screws.
10
3 x fixings for cradle mounting.
16
Dragonfly
Summary of Contents for E70085 Dragonfly
Page 2: ......
Page 4: ......
Page 10: ...10 Dragonfly ...
Page 14: ...14 Dragonfly ...
Page 18: ...18 Dragonfly ...
Page 28: ...28 Dragonfly ...
Page 32: ...32 Dragonfly ...
Page 52: ...52 Dragonfly ...
Page 70: ...70 Dragonfly ...
Page 78: ...78 Dragonfly ...
Page 82: ...82 Dragonfly ...
Page 95: ......
Page 96: ...www raymarine com ...