CHAPTER 2
6
TC1™ Installation Manual for Challenger MT7XX & MT8XX C/D/E
INSTALLATION BEST PRACTICES
RECOMMENDATIONS
Park the machine where the ground is level, clean, and dry before installing the TC1™ system. Bleed pressure from
the hydraulic system and leave the machine turned off for the duration of the installation process.
Follow good safety practices during the installation process. Be sure to carefully read the instructions in this
manual.
Raven Industries recommends the following best practices when installing or operating the TC1™ system for the
first time, at the start of the season, or when moving the TC1™ system to another machine:
• Verify that the machine’s hydraulic system is using fresh oil and that the filters have been recently changed
• Ensure there are no issues with the machine’s hydraulic system (e.g., pump issues, faulty hydraulic motors, fine
metal deposits in the hydraulic hoses, etc.).
POINT OF REFERENCE
The instructions in this manual assume that the operator is standing behind the machine, looking towards the cab.
KIT COMPONENTS
This section contains a list of the components that are included in the TC1 kit. Compare the items in the kit with the
components on this list before beginning the system installation. Contact your Raven dealer with any questions.
WARNING
Carefully read and follow all safety requirements
and precautions contained in this manual and the
machine-specific Installation Manual. Failure to
follow safety instructions may lead to equipment
damage, personal injury, or death.
Summary of Contents for TC1
Page 4: ...Table of Contents ii TC1 Installation Manual for Challenger MT7XX MT8XX C D E ...
Page 8: ...CHAPTER 1 4 TC1 Installation Manual for Challenger MT7XX MT8XX C D E ...
Page 14: ...CHAPTER 2 10 TC1 Installation Manual for Challenger MT7XX MT8XX C D E ...
Page 26: ...CHAPTER 3 22 TC1 Installation Manual for Challenger MT7XX MT8XX C D E ...