1. Empty product from the chemical supply tank and flush the injection pump with water.
2. Disconnect the injection pump plumbing and cabling. Remove the injection pump from the implement and
take to a suitable work area to perform maintenance.
3. Separate the pump from the motor by removing the four socket head screws.
4. Loosen the four socket head screws securing each pump head to the crank case.
5. Carefully remove the pump heads. While removing the pump heads, take care not to damage the exposed
finish on the piston during disassembly.
Item
Description
Raven P/N
Qt.
1
O-Ring, Viton
219-0002-015
4
2
O-Ring, Compound 117965-
80
219-0007-117
2
3
Seal, 3/4” Slipper
219-0000-125
2
Piston
Bearing
(2 Places)
1
(4 Places)
Torque to 41 in/lbs.
(17 places)
Piston
2
(2 Places)
3
(2 Places)
Discharge Valve Assembly
(P/N 063-0172-504)
Discharge valve/Transducer Plug
Assembly
(P/N 063-0173-310)
Intake Valve Assembly
(P/N 063-0173-677)
Summary of Contents for Sidekick Pro ISO
Page 8: ...CHAPTER 1 4 Sidekick Pro ISO Installation Operation Manual ...
Page 16: ...CHAPTER 2 12 Sidekick Pro ISO Installation Operation Manual ...
Page 46: ...CHAPTER 4 42 Sidekick Pro ISO Installation Operation Manual ...
Page 70: ...CHAPTER 7 66 Sidekick Pro ISO Installation Operation Manual ...
Page 80: ...Index 76 Sidekick Pro ISO Installation Operation Manual ...