
6
P/N 016-0171-509 Rev. E
55
INJECTION DIAGNOSTICS AND TROUBLESHOOTING
Node Voltage.
The high current voltage detected by the Sidekick Pro ISO node is displayed in this area.
Motor PWM.
The percent PWM value may be used to determine how hard the pump is being driven. A value of
100 indicates the pump is being driven at maximum.
Node Temp.
The temperature of the Sidekick Pro ISO node is displayed in this area. This value, in conjunction with
the motor RPM, may be useful to help determine how hard the pump is being driven.
Engaged Hours.
This value represents the number of hours which the injection node has been engaged for
operation.
START CAL, START PRIME, AND START RINSE SOFT KEYS
The Start Cal, Start Prime, and Start Rinse buttons are used during the pump priming, calibration, and rinsing
processes. Refer to the Prime the Injection Pump section on page 43 or the Calibrate the Injection Pump section
on page 44 for details on performing these processes.
NOTE:
The injection pump should be primed before starting a pump calibration.
ERROR STATUS AND SOLUTION
If any error conditions are encountered during an injected chemical application, the error type will be displayed on
the Injection Settings screen. Refer to Chapter 6, Injection Diagnostics and Troubleshooting, for detailed
troubleshooting information and solutions.
PRODUCT INFORMATION SCREEN
Select the information icon along the top of the setup display to access Product Information screen. This screen
displays hardware and software version information for the selected Sidekick Pro ISO.
Node Part Number.
The Raven part number of the Sidekick Pro ISO node.
Node Revision.
Hardware revision level of the Sidekick Pro ISO node.
Node Serial Number.
Serial number of the Sidekick Pro ISO node.
Software Part Number.
The Raven part number of the software installed on the Sidekick Pro ISO system.
Summary of Contents for Sidekick Pro ISO
Page 8: ...CHAPTER 1 4 Sidekick Pro ISO Installation Operation Manual ...
Page 16: ...CHAPTER 2 12 Sidekick Pro ISO Installation Operation Manual ...
Page 46: ...CHAPTER 4 42 Sidekick Pro ISO Installation Operation Manual ...
Page 70: ...CHAPTER 7 66 Sidekick Pro ISO Installation Operation Manual ...
Page 80: ...Index 76 Sidekick Pro ISO Installation Operation Manual ...