![Raven Sidekick Pro ISO Installation & Operation Manual Download Page 36](http://html.mh-extra.com/html/raven/sidekick-pro-iso/sidekick-pro-iso_installation-and-operation-manual_789032036.webp)
C
HAPTER
4
32
Sidekick Pro™ ISO Installation & Operation Manual
4. Select the button in the lower, right corner of the product control screen labeled ‘Pump Number: No Cal’ and
select the information icon along the top of the display to access the Product Information screen.
5. Locate the “Node Serial Number” on the Product Information screen and then locate the pump on the vehicle
or implement with the same number on the pump head or side of the injection pump motor.
6. Select the “Set Pump Number” field on the Product Information screen and select the control channel number
to which the pump and chemical tank are assigned. The Product Information screen will display the assigned
value and the UT menu icon will display the assigned pump number in the menu.
7. Repeat this process for each Sidekick Pro ISO Injection Pump connected to the system.
VIRTUAL TERMINAL CALIBRATION
Once installation of the injection system has been verified, and the motor control node is recognized by the
ISOBUS UT control console, the Sidekick Pro™ ISO and UT display must be calibrated to provide accurate control
of the injected product.
Summary of Contents for Sidekick Pro ISO
Page 8: ...CHAPTER 1 4 Sidekick Pro ISO Installation Operation Manual ...
Page 16: ...CHAPTER 2 12 Sidekick Pro ISO Installation Operation Manual ...
Page 46: ...CHAPTER 4 42 Sidekick Pro ISO Installation Operation Manual ...
Page 70: ...CHAPTER 7 66 Sidekick Pro ISO Installation Operation Manual ...
Page 80: ...Index 76 Sidekick Pro ISO Installation Operation Manual ...