background image

Copyright 2020

RCM ARAG Installation 

Manual

 016-7100-001 Rev. A

11/2020

E36341

Summary of Contents for RCM ARAG

Page 1: ...Copyright 2020 RCM ARAG Installation Manual 016 7100 001 Rev A 11 2020 E36341 ...

Page 2: ...aven Industries shall not be held responsible for any modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affect the availability and accuracy of wireless and satellite navigation and correction services e g GPS GNSS SBAS etc Therefore Raven Industries cannot guarantee t...

Page 3: ...dations and Best Practices 2 Harness Routing 2 Chapter 2 Introduction 5 Installation Best Practices 5 Recommendations 5 Point of Reference 5 Kit Components 6 Updates 7 Chapter 3 Installation 9 Power Harness 9 Best Mounting Practices 9 Mount the Power Harness 10 Install the RCM 11 Best Mounting Practices 11 Route and Connect the Cables 11 System Drawings 14 ...

Page 4: ...Table of Contents ii RCM ARAG Installation Manual ...

Page 5: ...under the influence of alcohol or an illegal substance Be alert and aware of surroundings and remain in the operator seat at all times when operating this Raven system Do not operate the implement on any public road with this Raven system enabled Disable this Raven system before exiting the operator seat Determine and remain a safe working distance from obstacles and bystanders The operator is res...

Page 6: ...ed and unbundled Use the following guidelines and recommendations when connecting and routing harnesses while installing or maintaining this Raven system Leave protective caps covers over harness connectors until needed to avoid dirt and moisture from contaminating electrical circuits Secure the harness to the frame or solid structural members at least every 12 in 30 cm Follow existing harness run...

Page 7: ... service personnel might step or use as a grab bar IMPORTANT Avoid applying direct spray or pressure washing of electrical components and connections High pressure streams and sprays can penetrate seals cause corrosion or otherwise damage electrical components When performing maintenance Inspect electrical components and connectors for corrosion damaged pins or housings etc Repair or replace compo...

Page 8: ...CHAPTER 1 4 RCM ARAG Installation Manual ...

Page 9: ...rate and section control INSTALLATION BEST PRACTICES RECOMMENDATIONS Before installing the RCM system park the machine where the ground is level clean and dry During the installation process follow good safety practices Be sure to carefully read the instructions in this manual as you complete the installation process POINT OF REFERENCE The instructions in this manual assume that you are standing b...

Page 10: ...ING KIT MOUNTING RCM SHEET WARRANTY HELP INSTALLATION CONFIGURATION MANUAL RAVEN RCM LEVEL 1 CABLE RCM CAB ISOBUS PWR CABLE RCM TO ARAG PRODUCT CABLE 3 SECTION 2 WIRE SWITCH ASSY FOOT ISO PRODUCT CONTROL T H 053 0159 012 N 063 0173 941B N 115 0172 616 N 115 0172 624 N 063 0173 080 N 117 0171 680 N 016 0171 649 N 016 7100 001 RAVEN RCM LEVEL 1 CABLE RCM CAB ISOBUS PWR CABLE RCM TO ARAG PRODUCT CABL...

Page 11: ...pportunity to see ourselves as our customers see us and are eager to gather ideas on how we have been helping or how we can do better To serve you best please send an email with the following information to techwriting ravenind com RCM ARAG Installation Manual 016 7100 001 Rev A Any comments or feedback include chapter or page numbers if applicable Let us know how long have you been using this or ...

Page 12: ...CHAPTER 2 8 RCM ARAG Installation Manual ...

Page 13: ...n a fixed position and in a dry clean and accessible spot The red wire is positive 12V The black wire is ground Ensure wires cannot be damaged during operation If a ground switch is used connect the wiring harness behind the ground switch If a main 12V switch is used connect the wiring harness behind the main switch If no main switch is used always connect the wiring harness directly to the batter...

Page 14: ...an auto steer system the power cables should always be connected to the battery Two options are possible a basic harness P N 115 8000 141 or an implement ready harness Front Mount P N 115 8000 060 and Mid Mount P N 115 8000 315 FIGURE 1 Basic Harness FIGURE 2 Implement Ready Harness ...

Page 15: ...By default the orientation of the RCM is set to horizontal position with connectors pointing downwards ensuring that water or moisture will not enter the connectors FIGURE 3 Mounted RCM Node ROUTE AND CONNECT THE CABLES 1 Connect the 12 pin Deutsch connector of the power cable to the in cab harness 2 Rotate and connect the RCM power cable P N 115 0172 616 to the gray male connector on the RCM FIGU...

Page 16: ...he RCM to ARAG cable P N 115 0172 624 625 626 to the black connectors on the RCM FIGURE 5 RCM to ARAG Cable Connected 4 Connect the 9 pin ISO connector of RCM Cab ISOBUS Power cable P N 115 0172 616 to the 9 pin ISO connector on the in cab harness FIGURE 6 Cable Connected to 9 Pin ISO Connector ...

Page 17: ... Product Cable P N 115 0172 624 625 626 to the ARAG product cable FIGURE 8 RCM to ARAG Product Cable Connected to ARAG Product Cable 7 Locate the COBO power socket in the tractor 8 Connect the RCM in cab ISOBUS power cable P N 115 0172 616 to the COBO power socket NOTE For setting the sprayer profile in the RCM module please refer to the Raven Rate Control Module RCM Operation Manual P N 016 0171 ...

Page 18: ...CM ARAG Installation Manual SYSTEM DRAWINGS FIGURE 9 RCM ARAG Bravo 3 Sections 2 Wire Valve System Drawing P N 054 7100 039 Rev A FIGURE 10 RCM ARAG Bravo 5 Sections 2 Wire Valve System Drawing P N 054 7100 040 Rev A ...

Page 19: ...ion System Drawings 15 INSTALLATION FIGURE 11 RCM ARAG Bravo 7 Sections 2 Wire Valve System Drawing P N 054 7100 041 Rev A FIGURE 12 RCM ARAG Bravo 6 7 Sections 3 Wire Valve System Drawing P N 054 7100 042 Rev A ...

Page 20: ...ARAG Installation Manual FIGURE 13 RCM ARAG 3 Sections 2 Wire Valve w CR7 ISO Cable System Drawing P N 054 7100 043 Rev A FIGURE 14 RCM ARAG 5 Sections 2 Wire Valve w CR7 ISO Cable System Drawing P N 054 7100 044 Rev A ...

Page 21: ... Drawings 17 INSTALLATION FIGURE 15 RCM ARAG 7 Sections 2 Wire Valve w CR7 ISO Cable System Drawing P N 054 7100 045 Rev A FIGURE 16 RCM ARAG 6 7 Sections 3 Wire Valve w CR7 ISO Cable System Drawing P N 054 7100 046 Rev A ...

Page 22: ...CHAPTER 3 18 RCM ARAG Installation Manual ...

Page 23: ...Index 016 7100 001 Rev A 19 H Hydraulic Fittings 7 I Introduction Installation Recommendations 5 Point of Reference 5 U Updates 7 ...

Page 24: ...Index 20 RCM ARAG Installation Manual ...

Page 25: ...er s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchase must be included inside the box to be sent to Raven Industries WHAT WILL RAVEN INDUSTRIES DO Upon confirmation of the warranty claim Raven Industries will at our discretion repair or replace the defective product and pay for the standard return freight regardle...

Page 26: ... claim and send it to Raven Industries for final approval The freight cost to Raven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchase must be included inside the box to be sent to Raven Industries In addition the words Extended Warranty must appear on the box and all documentation ...

Reviews: