CHAPTER 6
AUTOBOOM XRT ADVANCED
TUNING
PREPARATION
SENSOR DIMENSIONS
Verify the system dimensions are entered correctly for height sensor offsets and center rack width.
BOOM ANGLE SENSOR
Ensure the automated calibration sequence is performed over flat ground. If the sensor dimensions were updated,
re-perform the boom angle sensor calibration.
HYDRAULIC OIL
For best results, perform tuning with the hydraulic oil at normal operating temperature.
BASE CONTROL EFFORT CALIBRATION
Accurate base control effort values are necessary for successful advanced tuning. Only perform a Base Control
Effort Calibration after warming the hydraulic oil. If possible, engage AutoBoom and drive slowly for two minutes
prior to performing Base Control Effort calibration. This will ensure the Solenoid coils are at operating temperature
and will give the most accurate Base Control Effort.
TARGET CONTROL EFFORT TEST
1. Select
Diagnostics
.
2. Select
Tests
.
3. Select
Target Control Effort Test
.
FIGURE 1. Target Control Effort Test
Summary of Contents for Case IH AutoBoom XRT
Page 8: ...CHAPTER 1 4 Case IH AutoBoom XRT Calibration Operation Manual ...
Page 46: ...CHAPTER 5 42 Case IH AutoBoom XRT Calibration Operation Manual ...
Page 52: ...CHAPTER 6 48 Case IH AutoBoom XRT Calibration Operation Manual ...
Page 70: ...CHAPTER 7 66 Case IH AutoBoom XRT Calibration Operation Manual ...