
016-0235-002 Rev. B
17
CALIBRATION
7. If required, press the
Redetect Orientation
button to redetect the orientation of the ABM on the
Downward
Orientation
page.
NOTE:
The downward and forward orientations can be entered in the appropriate fields.
8. Press
Next
.
9. Verify the machine is parked on a level surface.
FIGURE 4. Terrain Compensation Setup
10. Press
Calibrate Terrain Compensation
.
11. After terrain calibration compensation is complete, press
Next
.
NOTE:
If the AutoFold feature is unlocked and calibrated, the following steps will have been completed
during the AutoFold calibration. Skip to step 17 to continue the calibration process.
12. Fold the boom in so the booms are stored in the transport position.
13. Touch the
Next
button to continue fold calibration.
14. Raise the booms above the cradle lip and inward to contact vertical stops. Booms will control to the set point
when cradling.
FIGURE 5. AutoBoom Fold Setup - Raise Above Cradle
Summary of Contents for Case IH AutoBoom XRT
Page 8: ...CHAPTER 1 4 Case IH AutoBoom XRT Calibration Operation Manual ...
Page 46: ...CHAPTER 5 42 Case IH AutoBoom XRT Calibration Operation Manual ...
Page 52: ...CHAPTER 6 48 Case IH AutoBoom XRT Calibration Operation Manual ...
Page 70: ...CHAPTER 7 66 Case IH AutoBoom XRT Calibration Operation Manual ...