![Raven AutoBoom XRT Calibration & Operation Manual Download Page 21](http://html.mh-extra.com/html/raven/autoboom-xrt/autoboom-xrt_calibration-and-operation-manual_788967021.webp)
P/N 016-0235-001 Rev. B
17
CALIBRATION
FIGURE 8. Vertical Center Sensor Calibration - Operation Zone
24.Touch the Next button to continue the fold calibration.
25.Lower the center rack to a typical operating position and unfold the booms.
26.Press Next.
FIGURE 9. Vertical Center Sensor Calibration - Set to Spray Position
27.Enter the Center Rack Width. The center rack width is measured from the left boom pivot point to the right
boom pivot point. The pivot point is where the boom rotates as it is raised/lowered. The pivot point is generally
a horizontal steel pin.
Summary of Contents for AutoBoom XRT
Page 1: ...Copyright 2019 AutoBoom XRT Calibration Operation Manual P N 016 0235 001 Rev B 03 19 E32966 ...
Page 8: ...CHAPTER 1 4 AutoBoom XRT Calibration Operation Manual ...
Page 16: ...CHAPTER 3 12 AutoBoom XRT Calibration Operation Manual ...
Page 48: ...CHAPTER 5 44 AutoBoom XRT Calibration Operation Manual ...
Page 54: ...CHAPTER 6 50 AutoBoom XRT Calibration Operation Manual ...