C
HAPTER
1
2
Viper Pro Installation & Operation Manual
HYDRAULIC SAFETY
• Raven Industries recommends that appropriate protective equipment be worn at all times when working on the
hydraulic system.
• Never attempt to open or work on a hydraulic system with the equipment running. Care should always be
taken when opening a system that has been previously pressurized.
• Exercise caution when disconnecting the hydraulic hoses or purging is required, be aware that the hydraulic
fluid may be extremely hot and under high pressure.
• Any work performed on the hydraulic system must be done in accordance with the machine manufacturer’s
approved maintenance instructions.
• When installing AutoBoom hydraulics or performing diagnostics, maintenance, or routine service, ensure that
precautions are taken to prevent any foreign material or contaminants from being introduced into the
machine’s hydraulic system. Objects or materials that are able to bypass the machine’s hydraulic filtration
system will adversely reduce performance and possibly damage the AutoBoom hydraulic valves.
ELECTRICAL SAFETY
• Always verify that the power leads are connected to the correct polarity as marked. Reversing the power leads
could cause severe damage to the equipment.
• Ensure that the power cable is the last cable to be connected.
• Always disconnect batteries before performing electrical work.
Summary of Contents for AutoBoom UltraGlide XT
Page 39: ...3 Manual No 016 0171 122 Rev E 35 HYDRAULIC SYSTEM INSTALLATION HYDRAULIC SCHEMATIC ...
Page 40: ...CHAPTER 3 36 Viper Pro Installation Operation Manual ...
Page 64: ...CHAPTER 5 60 Viper Pro Installation Operation Manual WIRING DIAGRAM 2009 WIRING SCHEMATIC ...
Page 65: ...5 Manual No 016 0171 122 Rev E 61 WIRING INSTALLATION 2010 2011 WIRING SCHEMATIC ...
Page 66: ...CHAPTER 5 62 Viper Pro Installation Operation Manual 2012 NEWER WIRING SCHEMATIC ...
Page 67: ...5 Manual No 016 0171 122 Rev E 63 WIRING INSTALLATION ...
Page 68: ...CHAPTER 5 64 Viper Pro Installation Operation Manual ...