
C
HAPTER
5
50
Viper Pro Installation & Operation Manual
MODEL YEAR 2010-2011 - 9X4(H), 11X4(H), 13X6 SERIES NODE AND
HARNESS INSTALLATION
INSTALL THE NODE AND NODE HARNESS
FIGURE 9. Node Mounting Location
1. Locate the node box on the right side of the machine and remove the cover.
FIGURE 10. Bulkhead Plug Location
2. Remove the bulkhead plug.
NOTE:
Keep the bulkhead washer and lock nut for use later in this procedure.
AUTOBOOM TIP
CONTROL
Connection
Bulkhead Plug
Summary of Contents for AutoBoom UltraGlide XT
Page 39: ...3 Manual No 016 0171 122 Rev E 35 HYDRAULIC SYSTEM INSTALLATION HYDRAULIC SCHEMATIC ...
Page 40: ...CHAPTER 3 36 Viper Pro Installation Operation Manual ...
Page 64: ...CHAPTER 5 60 Viper Pro Installation Operation Manual WIRING DIAGRAM 2009 WIRING SCHEMATIC ...
Page 65: ...5 Manual No 016 0171 122 Rev E 61 WIRING INSTALLATION 2010 2011 WIRING SCHEMATIC ...
Page 66: ...CHAPTER 5 62 Viper Pro Installation Operation Manual 2012 NEWER WIRING SCHEMATIC ...
Page 67: ...5 Manual No 016 0171 122 Rev E 63 WIRING INSTALLATION ...
Page 68: ...CHAPTER 5 64 Viper Pro Installation Operation Manual ...