5. Blow any excess oil out of the hydraulic port threads.
6. Clean excess oil, grease, and debris from the top of the machine’s hydraulic valve.
7. Clean excess hydraulic fluid from the AutoBoom valve (P/N 063-0131-113).
8. Install the supplied 5/1”6-18 x 1-3/4” hex bolts (P/N 311-0052-108) and 5/16”-18 x 2-1/2” hex bolts (P/N 311-
0052-111) in the AutoBoom valve, placing the shorter bolt in the cut-out section of the valve.
9. Carefully place the AutoBoom valve on the machine’s hydraulic valve, positioning it so that the cut-out section
faces the accumulator.
FIGURE 3. AutoBoom Valve Mounted to the Machine’s Hydraulic Valve
10. Alternately tighten each bolt a small amount to a maximum of 15 - 20 ft. lbs. per bolt.
11. Install the hydraulic test fitting in Port GP of the AutoBoom valve.
INSTALL FITTINGS IN THE ULTRAGLIDE XT VALVE
Before mounting the UltraGlide XT valve (P/N 063-0131-154) on the machine, install the proper fittings in the valve.
This prepares the valve for installation and simplifies the hose connection process later in the procedure. Refer to
the figure and table below to install the fittings in the appropriate ports of the UltraGlide XT valve.
FIGURE 4. Fittings Installed in UltraGlide XT Valve
Accumulator
Hydraulic Test
Fitting Installed in
Port GP
Summary of Contents for AutoBoom UltraGlide XT
Page 39: ...3 Manual No 016 0171 122 Rev E 35 HYDRAULIC SYSTEM INSTALLATION HYDRAULIC SCHEMATIC ...
Page 40: ...CHAPTER 3 36 Viper Pro Installation Operation Manual ...
Page 64: ...CHAPTER 5 60 Viper Pro Installation Operation Manual WIRING DIAGRAM 2009 WIRING SCHEMATIC ...
Page 65: ...5 Manual No 016 0171 122 Rev E 61 WIRING INSTALLATION 2010 2011 WIRING SCHEMATIC ...
Page 66: ...CHAPTER 5 62 Viper Pro Installation Operation Manual 2012 NEWER WIRING SCHEMATIC ...
Page 67: ...5 Manual No 016 0171 122 Rev E 63 WIRING INSTALLATION ...
Page 68: ...CHAPTER 5 64 Viper Pro Installation Operation Manual ...