
3
016-5035-038 Rev. A
23
HYDRAULIC SYSTEM INSTALLATION
FIGURE 16. Excess Flow Rerouting
7. Disconnect the Tank hose on the bottom of the loader valve from the existing 90° swivel elbow.
8. Connect the run tee (P/N 333-0012-113) to the existing 90° swivel elbow and reconnect the existing hydraulic
hose to the through port of the tee fitting.
FIGURE 17. Steering Valve Tank Port Connection
9. Connect the supplied 90° swivel elbow (P/N 333-0012-108) to the open branch of the tee fitting.
10. Attach the straight end of the supplied hose (P/N 214-1001-211) to the elbow fitting and route to the T port on
the steering valve.
11. Tighten all hose connections on the steering valve and fittings and connections in the P, T, and EF lines.
Machine Pressure
Port Location
Steering Valve
P Port
Steering Valve
T Port
Existing
Hose
Existing
Elbow Fitting
Supplied Tee
and Elbow
Fittings
Loader Valve
Summary of Contents for 053-0159-015
Page 4: ...Table of Contents ii TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 10: ...CHAPTER 1 6 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 16: ...CHAPTER 2 12 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 44: ...CHAPTER 5 40 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 46: ...Index 42 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...