
C
HAPTER
3
22
TC1/HDU Installation Manual for Kubota M5 Series (Non-Steer Ready)
EQUIPMENT WITH LOADER
1. Find the existing machine hose with a 90° end connected to the P port on the loader valve.
FIGURE 14. Reroute Existing Pressure Hose
2. Disconnect the hose from the loader valve and route to EF port on the steering valve.
NOTE:
Do not tighten the EF port until the connections to the P and T ports are completed in the following
steps.
3. Trace this hose to the other end and disconnect from the machine P port.
4. Disconnect this end of the hose and reconnect to the loader valve where the other end was originally
connected.
FIGURE 15. Existing Pressure Hose Connected to Steering Valve
5. Connect the straight end of the hydraulic hose (P/N 214-1001-212) to the machine P port under the tractor
where the hose was disconnected in step 3.
6. Route the 90° end to the P port on the steering block.
Loader P Port
EF Port
Loader Valve
Existing
Summary of Contents for 053-0159-015
Page 4: ...Table of Contents ii TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 10: ...CHAPTER 1 6 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 16: ...CHAPTER 2 12 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 44: ...CHAPTER 5 40 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...
Page 46: ...Index 42 TC1 HDU Installation Manual for Kubota M5 Series Non Steer Ready ...