background image

UV-USA SCC_WE, CM_P V04, 02/2013

1

UltraVent®  (Condensation extractor hood)

61/101/62 Electric

 

for units produced as of 09/2011

UltraVent®  (Hotte aspirante)

61/101/62 Électrique

 

pour les appareils fabriqués à partir de 09/2011

Summary of Contents for UltraVent

Page 1: ...CC_WE CM_P V04 02 2013 1 UltraVent Condensation extractor hood 61 101 62 Electric for units produced as of 09 2011 UltraVent Hotte aspirante 61 101 62 lectrique pour les appareils fabriqu s partir de...

Page 2: ...directives given hereunder are not covered by warranty and liability terms Brief operating instructions page 13 14 Notes Cher installateur Veuillez vous conformer aux consignes de ce guide d installa...

Page 3: ...UV USA SCC_WE CM_P V04 02 2013 3 Connection diagram UltraVent 62 Measures in inch Connection diagram UltraVent 61 101 Measures in inch...

Page 4: ...ion 12VDC between terminal 4 and 5 1 2 4 5 L N green white black brown white brown white green to X23 connector A8 Door switch X27 use supplied power cable M1 gn ye M1 blue M1 brown M1 black M2 gn ye...

Page 5: ...to F7 3019 0122 16 Capacitor 14 F C1 C2 40 04 229 17 Capacitor 40 F C3 C4 40 04 230 Description Part nos Qty Interface pcb A 8 42 00 031 1 Control cable W26 40 02 008 1 Control cable W23 40 02 049 1 C...

Page 6: ...em Description Qty 1 Gasket adapter vent pipe 1 2 Cable gland 2 3 Connection cable to terminal X23 W26 1 4 Self adhesive cable clip 5 5 Drain pipe 1 6 Silicon hose apprx 5 ft 7 Hose clip 2 8 Connectio...

Page 7: ...rect adjustment Replace rear screw of the top door holding plate by stud item 10 and washer pic 4 Carefully place Ultravent onto unit pic 5 Remove fat and fiber media filter Fasten UV EH with nut and...

Page 8: ...m 3 is included in the Ultravent kit Connect this cable as follows pic 9 on SCC_WE units pic 10 Connect control cable W26 to terminal X23 of the cpu pcb on CM_P units pic 11 Connect the control cable...

Page 9: ...as follows pic 14 1 There is an extra interface pcb A8 delivered with the Ultravent kit Fix it to the electrical mounting plate of the combi at a suitable posi tion 2 In the kit also cable W24 pic 1...

Page 10: ...the silicone hose pic 1 pos 6 to the desired length and push it over the connection piece of the drain pipe pic 1 pos 5 pic 16 Ensure there are no kinks or sags in the hose Cut length to fit depending...

Page 11: ...pic 20 b Connect Ultravent and Combi Steamer to mains c Switch on Ultravent and Combi Steamer select cooking mode time temperature and close unit s door d Set adjusting disc of the pressure switch to...

Page 12: ...dge of the door pic 25 c Use the deflector as a template and mark the three positions where the holes of the screws must be drilled use the supplied bit pic 26 The top edge of the deflector and of the...

Page 13: ...artially door remains locked by the locking system of the hood After the 50 seconds have elapsed it is possible to open the door completely When closing the oven s door automatically the UltraVent swi...

Page 14: ...ed behind the fat filters and should be inspected for contaminants on a regular basis They have to be changed at least every 3 months do not clean in dishwashers 1 Disconnect hood from mains 2 Remove...

Page 15: ...WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 21 WEEK 22 WEEK 23 WEEK 24 WEEK 25 WEEK 26 WEEK 27 WEEK 28 WEEK 29 WEEK 30 WEEK 31 WEEK 32 WEEK 33 WEEK 34 WEEK 35 WEEK 36 WEEK 37 WEEK 38 WEEK 39 WEEK 40...

Page 16: ...UV USA SCC_WE CM_P V04 02 2013 16 Notes...

Page 17: ...UV USA SCC_WE CM_P V04 02 2013 17 Sch ma des branchements UltraVent 62 unit s de mesure en pouces Sch ma des branchements UltraVent 61 101 unit s de mesure en pouces...

Page 18: ...ion 12VDC between terminal 4 and 5 1 2 4 5 L N green white black brown white brown white green to X23 connector A8 Door switch X27 use supplied power cable M1 gn ye M1 blue M1 brown M1 black M2 gn ye...

Page 19: ...14 F C1 C2 40 04 229 17 Condensateur 40 F C3 C4 40 04 230 D signation R f re Qt Interface pcb A 8 42 00 031 1 C ble de commande W26 40 02 008 1 C ble de commande W23 40 02 049 1 C ble de commande W24...

Page 20: ...pour joint tuyau d air 1 2 Presse toupe c bles 2 C ble de connexion au terminal X23 W26 1 4 Attache c ble autocollante 5 5 Conduite d vacuation 1 6 Flexible en silicone env 5 ft 7 Attache tuyau 2 8 C...

Page 21: ...en haut de la char ni re de porte et remplacez la par le boulon de fixation avec la rondelle de calage pos 7 fig 4 Placez la hotte UltraVent sur l appareil avec pr caution fig 5 Enlevez les filtres g...

Page 22: ...e de commande W26 fig 1 pi ce 3 est compris dans le kit Ultravent Branchez ce c ble comme suit fig 9 sur les appareils SCC_WE fig 10 Branchez le c ble de commande W26 avec le terminal X23 du pcb cpu s...

Page 23: ...Ultravent sont reli s lectriquement Les conditions suivantes doivent tre remplies pour que le four mixte puisse fonctionner a UV doit tre sous tension en position ON b Tous les filtres charbon et grai...

Page 24: ...ait e et passez le sur le branchement de la conduite d vacuation fig 1 pos 5 fig 16 vitez les plis et les courbes D coupez la longueur correspondante en fonc tion de la taille de l appareil 3 Installa...

Page 25: ...ltre graisse fig 20 b Branchez Ultravent et le four mixte l alimentation c Mettez sous tension Ultravent et le four mixte s lectionnez le mode de cuisson la dur e la temp rature et fermez la porte de...

Page 26: ...de la porte fig 25 c Servez vous du d flecteur comme mod le et marquez 3 positions aux endroits ou les trous pour les vis doivent tre perc s utilisez le foret fourni fig 26 L extr mit sup rieure du d...

Page 27: ...t de 50 secondes il est possible d ouvrir la porte enti rement En fermant la porte du four UltraVent repasse automatiquement la vitesse d aspiration mini male vitesse basse du ventilateur Remarque si...

Page 28: ...rifier r guli rement s il n est pas obstru Il faut proc der au remplacement au moins une fois tous les 3 mois ne pas nettoyer au lave vaisselle 1 D branchez la hotte de l alimentation lectrique 2 Enl...

Page 29: ...18 Semaine 19 Semaine 20 Semaine 21 Semaine 22 Semaine 23 Semaine 24 Semaine 25 Semaine 26 Semaine 27 Semaine 28 Semaine 29 Semaine 30 Semaine 31 Semaine 32 Semaine 33 Semaine 34 Semaine 35 Semaine 3...

Page 30: ...UV USA SCC_WE CM_P V04 02 2013 30...

Page 31: ...UV USA SCC_WE CM_P V04 02 2013 31...

Page 32: ...2 80 05 214 UV USA SCC_WE CM_P V04 02 2013 RATIONAL AG Iglinger Stra e 62 D 86899 Landsberg a Lech Tel 49 81 91 32 70 Fax 49 81 91 2 17 35 www rational ag com RATIONAL Cooking Systems Inc USA Tel 1 84...

Reviews: