![Rational iCombi Pro XS 6-2/3 Operating Instructions Manual Download Page 49](http://html1.mh-extra.com/html/rational/icombi-pro-xs-6-2-3/icombi-pro-xs-6-2-3_operating-instructions-manual_3816265049.webp)
10 | iProductionManager
Operating instructions
49 / 112
10
iProductionManager
The iProductionManager organises the entire production process intelligently and flexibly. This includes which
products can be cooked together, the optimal preparation sequence of the dishes and the monitoring of the
cooking path.
The iProductionManager will remind you when a product needs to be loaded or taken out. You can decide whether
the food is cooked energy-optimised, time-optimised or with a specific target time. Accordingly, the
iProductionManager intelligently arranges the preparation order of the dishes. For you this means that you always
have everything under control, without checking or monitoring, therefore achieving high efficiency in your food
production.
Timeline axis
Trays
Ticket board
Manual tickets
Timeline axis return
Humidification
Timeline axis
Positioning aid for target time cooking
Energy optimisation
Time optimisation
Close planning gaps
Optimisation functions
Climate settings
10.1
Create manual tickets
You can add manual tickets to the iProductionManager. You first set the climate and then choose if the ticket
should be created using the cooking time or the core temperature. Please note: If you are cooking food with the
integrated core temperature probe, you can only place one manual core temperature ticket on the time axis at one
time.