SECTION 13: S
ERVICING
37 of 59
SECTION 13: SERVICING
13.1 Servicing Instructions
After start-up, the heater will require maintenance to
be carried out, at a minimum, annually. If the heater
is used in a dirty or dusty area, more frequent
maintenance may be required.
IMPORTANT:
Prior to any maintenance or service of
the heater, shut off, lockout and tagout the electrical
disconnect and gas valve that supplies the unit in
accordance with OSHA regulations. After any
maintenance or repair work, always test fire the
heater in accordance with the start-up instructions
on Page 29, Section 11 through Page 34, Section
11.7 to help ensure all safety systems are in working
order before leaving the heater to operate. Minor
faults may be traced by using the troubleshooting
charts on Page 41, Section 14 through Page 45,
Section 14.5.
IMPORTANT:
Check all gas pipes and pipe joints to
ensure there are no cracks or gas leaks. Any cracks
in the pipes or pipe joints must be repaired.
IMPORTANT:
Inspect all suspended components
and hardware. Ensure that they are in good
condition, properly tightened, and corrosion free.
13.2 Burner Maintenance
13.2.1 Burner Maintenance for Models 150-400
1. Open the hinged door and remove from the
hinges. Set door aside. See Page 47, Section
15.2.
2. Remove the filler panel (10 screws) to fully
access the burner assembly. See Page 47,
Section 15.2.1.
3. Remove burner assembly from cabinet via six
screws. See Page 47, Section 15.2.1. Electrode
and flame probe should remain attached.
4. Remove manifold from burner assembly via
four screws, two on top and two on bottom. See
Page 48, Section 15.2.2. Clean any deposits
from the main burner which may have formed in
the injectors or venturi of the burner.
5. Chech condition of ignition electrode and flame
probe. Clean off any deposits which may have
formed, check condition of ceramic insulators.
Replace as required. See Page 49, Section
15.3.
13.3 Fan/Motor Assembly Maintenance
The main fan bearings are permanently sealed and
do not need lubrication. Before cleaning, turn off gas
Cut/Pinch Hazard
Wear protective gear
during installation,
operation and service.
Edges are sharp.
WARNING
Failure to follow these instructions can result in death, electric shock, injury or property damage.
Burn Hazard
Allow heater to cool
before service.
Tubing may still be hot
after operation.
Explosion Hazard
Turn off gas supply to
heater before service.
DANGER
Electrical Shock Hazard
Disconnect electric
before service.
Heater must be
connected to a properly
grounded electrical
source.
WARNING
Severe Injury Hazard
Turn off gas and electrical supply before
service.
Fan can start automatically at any time.
Failure to follow these instructions can
result in severe injury or product damage.
Summary of Contents for UHAT 150
Page 2: ......
Page 4: ......
Page 8: ......
Page 50: ...UHA STANDARD UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 42 of 59 14 1 General...
Page 65: ...SECTION 16 SPECIFICATIONS 57 of 59 16 4 Dimension Data for Models UHA T M X S 300 400...
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......