background image

UHA S

TANDARD 

U

NIT 

H

EATER 

I

NSTALLATION 

O

PERATION AND 

S

ERVICE 

M

ANUAL

10 of 59

SECTION 7: VENTING

7.1 Venting

This heater must be vented in accordance with the 

rules contained in this manual and with the following 
national codes and any state, provincial or local 
codes which may apply: 

United States:

 Refer to 

NFPA 54/ANSI Z223.1 - latest revision, National 
Fuel Gas Code; 

Canada:

 Refer to CSA B149.1 

Natural Gas and Propane Installation Code.

The bottom of the vent or air intake terminal shall not 

be located less than 1' (.3 m) above grade level.

The vent shall not terminate less than 7' (2.1 m) 

above grade where located adjacent to public     
walkways.

Vent terminal must be installed at a height sufficient 

to prevent blockage by snow and building materials 
protected from degradation by flue gasses.

Vent terminal must be beyond any combustible 

overhang.

Secure all joints with corrosion resistant #8 x 3/8" 
sheet metal screws. 

For single wall venting, pressure sensitive aluminum 
tape or silicone sealant must be used to seal all 
joints.

Aluminum tape shall have a minimum temperature 

rating of 400° F (204° C) and meet SMACNA AFTS-
100-73 standards.  High temperature silicone 
sealant must have a minimum temperature rating of 
480° F (250° C).

7.1.1 United States Requirements

Vent must terminate at least 3' (.9 m) above any 

forced air inlet located within 10' (3.1 m).

Vent must terminate at least 4' (1.2 m) below, 

4' (1.2 m) horizontally from, or 1' (.3 m) above any 
door, operable window, or gravity air inlet into any 
building.

NFPA 54/ANSI Z223.1 - latest revision, National 
Fuel Gas Code specifies a 4' (1.2 m) horizontal vent 
terminal clearance from gas and electric meters, 

regulators and relief equipment.

7.1.2 Canadian Requirements

The vent shall not terminate within 6' (1.8 m) of a 

mechanical air supply inlet to any building.

The vent shall not terminate within 3' (.9 m) of a 

window or door that can be opened in any building, 
any non-mechanical air supply inlet to any building, 
or of the combustion air inlet of any other piece of 
equipment. 

7.2 Vent Installation

Maintain clearances to combustibles at all times for 
safety. Clearances are the required distances that 
combustible objects must be away from the heater 
to prevent serious fire hazard. See Page 7, Figure 3. 
For vented units, the vent must terminate outside of 
the building. 

Vents must be fully sealed and correctly sized for 

the model. If the vent passes through a wall or 
ceiling of combustible material, it must be enclosed 
by a listed thimble and be separated from the 
thimble by at least a 2" (5 cm) air gap.
For separated combustion models, vents and air 
intakes must be a fully sealed system and correctly 
sized for the model. Vent should be assembled as 
detailed on Page 12, Figure 5 through Page 16, 
Figure 10
. The joints between the vent terminal and 
the roof or wall must be properly sealed. If the vent 
passes through a wall or ceiling of combustible 
material, it must be enclosed by a listed thimble and 
be separated from the thimble by at least a 2" (5 cm) 
air gap.

Vents and air intakes must be adequately 

supported so that the heater does not bear the 
weight of the pipes.

For vent termination See Page 12, Figure 5 through 
Page 16, Figure 10.

7.2.1 Standard Vented Heaters 
(Models UHA[T][M][X] 150-400)

The vent must be fitted with a low resistance 

terminal. See Page 12, Figure 5 through Page 14, 
Figure 7. St
andard vented heaters do not allow 
outdoor air intake for combustion air.

7.2.2 Separated Combustion Heaters 
(Models UHA[T][M][X]S 150-400)

The heaters are designed to be installed as 

separated combustion heaters. The vent and air 
intake are run as separate pipes to the wall or roof 
terminals. See Page 15, Figure 8. As an option, the 
vent and air intake are run as separate pipes to a 

WARNING

Carbon Monoxide Hazard

Heaters must be vented 

outdoors.

Heaters must be installed 

according to the 

installation manual.

Failure to follow these 

instructions can result in 

death or injury.

Summary of Contents for UHAT 150

Page 1: ...done by a contractor qualified in the installation and service of gas fired heating equipment or your gas supplier Improper installation adjustment alteration service or maintenance can result in deat...

Page 2: ......

Page 3: ...n respect de ces instructions peut entra ner la mort des blessures corporelles ou des dommages mat riels ATTENTION L installation doit tre effectu e par un installateur prouv contractant qualifi dans...

Page 4: ......

Page 5: ...Series Internal Wiring Diagram for Single Stage Gas Valves 22 10 4 UHA X S Series Ladder Wiring Diagram for Single Stage Gas Valves 23 10 5 UHA T X S Series Internal Wiring Diagram for Two Stage Gas...

Page 6: ...16 4 Dimension Data for Models UHA T M X S 300 400 57 16 5 General Technical Data Table 58 16 6 Technical Data Table 58 SECTION 17 The RAPID UHA Series Warranty 59...

Page 7: ...rtical and Horizontal Vent Termination Separated Combustion Heater 16 Figure 11 Gas Connection 19 Figure 12 Automatic Burner Control Sequence 30 Figure 13 Single Stage Gas Valve for Models UHA X S 150...

Page 8: ......

Page 9: ...and operated under the general concepts of reasonable use and installed using the best building practices This equipment is not intended for use by persons including children with reduced physical sen...

Page 10: ...y Description Part Number Logo Label 91031102 Cut Hazard Label 91010430 Vent Length Label 91039505 Vent to Outdoors Label 91010427 Warning Label 91010429 Rating Plate Label 91010418 Installation Label...

Page 11: ...ber Logo Label 91031102 Cut Hazard Label 91010430 Vent Length Label 91039505 Vent to Outdoors Label 91010427 Warning Label 91010429 Rating Plate Label 91010418 Installation Label 91010431 Instruction...

Page 12: ...033 is illustrated on the back cover Know your model number and installed configuration Model number and installed configuration are found on the heater serial plate and throughout the Installation Op...

Page 13: ...ndoors Must be installed in a level position with horizontal discharge May be mounted on a shelf of non combustible material May be suspended from above See Page 9 Figure or from wall brackets of suff...

Page 14: ...inity of this heater The stated clearances to combustibles represents a surface temperature of 90 F 50 C above room temperature Building materials with a low heat tolerance such as plastics vinyl sidi...

Page 15: ...rs may be mounted at a higher level if destratification fans are installed For Models UHA 150 400 venting directly from top of heater is not applicable For roof terminal vent elbow duct off back of he...

Page 16: ...ision Canada Refer to Natural Gas and Propane Installation Code Standard CSA B149 1 latest revision 5 4 Electrical The heater must be electrically grounded in accordance with the following codes Unite...

Page 17: ...lines must not be used to support the heater Do not locate the gas or electrical supply lines directly over the path of the flue products from the heater The heater must be installed in a location th...

Page 18: ...r that can be opened in any building any non mechanical air supply inlet to any building or of the combustion air inlet of any other piece of equipment 7 2 Vent Installation Maintain clearances to com...

Page 19: ...ed at the roof or wall penetration instead of a thimble Ensure vent manufacturer s clearance from vent material is maintained Seal annular space of the type B 1 vent as well as all joints in the remai...

Page 20: ...gas fired equipment or your local gas supplier If the venting must be resized use appropriate tables in US Appendix G of NFPA 54 ANSI Z223 1 latest revision National Fuel Gas Code US or Standard CSA B...

Page 21: ...al Option Horizontal Option Vent 90 Bend 12 31 cm Minimum from roof to vent termination Vent Termination Listed thimble through combustible wall Flashing By Others 12 31 cm Minimum from wall to vent t...

Page 22: ...ositioned to avoid direct opposition between streams of combustion gases Roof 2 6 m Minimum Type B vent cap 7 18 cm or 8 20 cm may be used These are not available from the manufacurer Roof Flashing Ap...

Page 23: ...0 400 5 13 cm 90502105 4 10 cm Single Wall Vent Pipe By Others Seal joint between single wall and Type B vent with silicone sealant Use 3 sheetmetal screws equally spaced around joint Use 3 sheetmetal...

Page 24: ...m Collar By Others Attach with 3 sheet metal screws 12 31 cm Minimum from roof to combustion air terminal Flashing By Others 12 31 cm Minimum from wall to combustion air terminal Description Part Numb...

Page 25: ...de Combustion Air Supply If outside combustion air supply is required separated combustion model UHA T M X S heaters must be used Caution If the building has a slight negative pressure or corrosive co...

Page 26: ...included in the layout drawing contact the local gas supplier An isolating valve and union connection should be used and fitted into the supply adjacent to the heater A minimum 1 8 NPT plugged tapping...

Page 27: ...Heavy Gauge Pipe Gas Connector Option A Stainless Steel Flexible Gas Connector Do not twist flexible gas connector Ensure all joints are gas tight CAUTION Hold gas nipple securely with pipe wrench whe...

Page 28: ...m thermostat should be mounted on a vibration free wall or column at a height of approximately 5 1 5 m from the floor to measure the ambient temperature It should be clear of both cold drafts and the...

Page 29: ...SECTION 10 WIRING 21 of 59 10 2 Low Voltage Thermostat for Models UHA T M X S 150 400 NOTE Models 300 400 have two axial fans NOTE Electrical supply is located below terminal strip...

Page 30: ...agram for Single Stage Gas Valves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material havi...

Page 31: ...Valves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material having a temperature rating of...

Page 32: ...ge Gas Valves 1 W2 HIGH LOW CONTROL HIGH LOW COMMON NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wi...

Page 33: ...s HIGH STAGE NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material having a temperature rati...

Page 34: ...Diagram for Modulating Gas Valves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material havi...

Page 35: ...lves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material having a temperature rating of at...

Page 36: ...LLATION OPERATION AND SERVICE MANUAL 28 of 59 10 9 Electrical Connection to the Heater Note Junction box is not provided with heater Conduit can also be attached directly to heater with wire junction...

Page 37: ...gas installation including the gas meter must be inspected tested for gas tightness and purged in accordance with local and national codes Ensure that the air is fully purged from the heater inlet pi...

Page 38: ...ure 12 There will be no ignition of the burner and lockout will occur which proves the controls are operating correctly Figure 12 Automatic Burner Control Sequence Burner Sequence for Ignition Control...

Page 39: ...Inlet I l t P TOP VIEW END VIEW Description Part Number Gas Valve 150 250 NG 90032505 Gas Valve 150 250 LP 90032506 Gas Valve 300 400 NG 90032520 Gas Valve 300 400 LP 90032521 PSI IN C ON OFF LO HI Re...

Page 40: ...f 59 Figure 15 Modulating Gas Valve for Models UHA M X S 150 400 Description Part Number Gas Valve 150 250 NG 90032505 Gas Valve 150 250 LP 90032506 Gas Valve 300 400 NG 90032520 Gas Valve 300 400 LP...

Page 41: ...ve To adjust high fire burner pressure remove regulator cover from Honeywell single stage gas valve and turn regulator adjustment screw to set required burner pressure as stated in the Technical Data...

Page 42: ...ater for service or during off season 11 5 External Controls External controls may include time switch interlock switch room thermostat and frost thermostat Operate each control to ensure that they fu...

Page 43: ...ely The fan will continue to run for 90 seconds To restart turn the thermostat on or above room temperature 12 3 Simple Troubleshooting Some possible reasons for the heater not operating are 1 Gas sup...

Page 44: ...AULT MODE Slow Flash Normal Operation No call for heat Fast Flash Normal Operation Call for heat 2 Flashes Ignition Lockout No flame detected 3 Flashes Airflow Fault Pressure switch open or closed 4 F...

Page 45: ...2 Remove the filler panel 10 screws to fully access the burner assembly See Page 47 Section 15 2 1 3 Remove burner assembly from cabinet via six screws See Page 47 Section 15 2 1 Electrode and flame p...

Page 46: ...take components to ensure they are in good condition gas tight and corrosion free 13 8 Maintenance Checklist Installation Code and Annual Inspections All installations and service of RAPID equipment m...

Page 47: ...ow Make sure it is clean and free of cracks or holes Clean and replace as required Flue Blower Scroll Wheel and Motor Compressed air or a vacuum cleaner may be used to clean dust and dirt Inshot Burne...

Page 48: ...ION OPERATION AND SERVICE MANUAL 40 of 59 Wall Tag If a wall tag is present make sure it is legible and accurate Please contact Rapid Engineering LLC or your RAPID independent distributor if you need...

Page 49: ...e to follow these instructions can result in death electric shock injury or property damage Burn Hazard Allow heater to cool before service Tubing may still be hot after operation Explosion Hazard Tur...

Page 50: ...UHA STANDARD UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 42 of 59 14 1 General...

Page 51: ...14 2 Troubleshooting For Automatic Ignition Burner Systems For your safety and optimum heater performance use only replacement parts sold and supplied by Rapid Engineering LLC Conduct start up proced...

Page 52: ...r or replace as required Is inlet burner gas pressure correct Is live and neutral polarity correct Is flame probe circuit correct Is there a current flowing in the flame probe circuit with no flame pr...

Page 53: ...valve rise when valve turns on No Yes Is gas pressure at inlet of the valve correct for gas type Note pressure found No Yes START If problems persist contact Rapid Engineering LLC at www rapidenginee...

Page 54: ...ECT GAS VALVE IS USED WHEN REPLACING THESE CONTROLS Carbon Monoxide Hazard WARNING Use only genuine RAPID replacement parts per this installation operation and service manual Failure to follow these i...

Page 55: ...ent with Hinged Door Removed Before burner removal remove the 10 screws holding the filler panel on and remove the filler panel NOTE Models UHA 300 400 have two axial fans Side View of Burner Compartm...

Page 56: ...rifice Quantity 7 8 9 10 11 12 14 14 Natural Gas Orifice Marking 43 43 2 25 mm 2 25 mm 2 25 mm 43 43 40 P N 91930043 91930043 91930225 91930225 91930225 91930043 91930043 91930040 Propane Orifice Mark...

Page 57: ...Burners UHA T M X S 200 92000000 9 Inshot Burners UHA T M X S 225 92000000 10 Inshot Burners UHA T M X S 250 92000000 11 Inshot Burners UHA T M X S 300 92000000 12 Inshot Burners UHA T M X S 350 92000...

Page 58: ...de of aluminized steel 409 stainless steel The tube supports are made of aluminized steel 409 stainless steel 15 5 Louvers and Louver Spring The louvers for standard range models UHA T M X S 150 UHA T...

Page 59: ...ng an flue blower See Page 29 Section 11 MODEL UHA T M X S 150 300 Flue Blower P N 90710403 Remove screws securing outlet flange to the flue adapter Refit in reverse order Disconnect electrical connec...

Page 60: ...402 Vent Box Outlet Gasket Flue Blower Vent Box screws Flue Adapter Flue Adapter to Flue Blower screw Rear Panel Hole Disconnect electrical connections at plug in tabs Mounting Plate to Vent Box screw...

Page 61: ...s supplied completely assembled and balanced Carbon Monoxide Hazard Use correct pressure switch specified for each model Use of incorrect pressure switch or disabling pressure switch circuit could cau...

Page 62: ...ly genuine replacement parts sold and supplied by Rapid Engineering LLC 15 11 Limit Switches 15 11 1 Removal and Replacement 1 Remove the electrical connections to the switch 2 Unscrew the two screws...

Page 63: ...25 5 64 8 25 5 64 8 D in cm 17 6 44 7 17 6 44 7 17 6 44 7 17 6 44 7 17 6 44 7 E in cm 19 4 49 3 19 4 49 3 19 4 49 3 19 4 49 3 19 4 49 3 F in cm 30 0 76 2 30 0 76 2 32 0 81 3 32 0 81 3 32 0 81 3 G in c...

Page 64: ...1 40 1 40 1 Weight Net lbs kg 217 98 4 237 107 5 255 115 7 265 120 2 270 122 5 Model UHA T M X S 150 UHA T M X S 175 UHA T M X S 200 UHA T M X S 225 UHA T M X S 250 Total Input High Fire Btu h x 1000...

Page 65: ...SECTION 16 SPECIFICATIONS 57 of 59 16 4 Dimension Data for Models UHA T M X S 300 400...

Page 66: ...7 N in cm 6 5 16 5 6 5 16 5 6 5 16 5 Model UHA T M X S 300 UHA T M X S 350 UHA T M X S 400 Full Load Amps 120 V A 11 6 11 6 11 6 Air Volume CFM 4663 4663 4663 Flue and Air Intake Flue Intake Size in...

Page 67: ...ta plate and or serial number are removed defaced modified or altered in any way The ownership of the RAPID UHA Series is moved or transferred This warranty is nontransferable Rapid Engineering LLC is...

Page 68: ......

Page 69: ......

Page 70: ......

Page 71: ......

Page 72: ......

Reviews: