Putting into Operation
R&S
®
NRP2
21
User Manual 1173.9157.02 ─ 03
●
During the test of the network connection, additional information is provided, as
described in
chapter 1.8.2.2, "Function check"
●
If an error is detected when the non-volatile memory containing instrument settings
is checked, an error message is displayed when booting is completed.
The non-volatile memory is then re-initialized completely and the R&S
NRP2 goes
into the preset state. All instrument settings that have been saved are lost as a result
of this procedure.
1.8.3 Shutting down the meter
Whenever the meter is switched off, its settings are saved. The next time it is switched
on, these settings are automatically restored.
► Press the ON/STANDBY key to save the current setup, shut down the operating
system and set the instrument to standby state.
Fig. 1-11: ON / Standby key
Switching off the AC power
You can leave the AC power on permanently to preserve your last instrument settings.
Switching off is required only if the instrument must be completely disconnected from all
power supplies.
Starting the R&S
NRP2
Summary of Contents for NRP2
Page 1: ...R S NRP2 Power Meter User Manual User Manual 2 1173 9157 02 03 Test Measurement...
Page 20: ......
Page 24: ...Contents R S NRP2 6 User Manual 1173 9157 02 03...
Page 40: ...Putting into Operation R S NRP2 22 User Manual 1173 9157 02 03 Starting the R S NRP2...
Page 352: ...Maintenance R S NRP2 334 User Manual 1173 9157 02 03 Storage...
Page 366: ...Error Messages and Troubleshooting R S NRP2 348 User Manual 1173 9157 02 03 Bootmenu...
Page 382: ...Remote control interfaces R S NRP2 364 User Manual 1173 9157 02 03 USB interface...
Page 394: ...Standard Configurations R S NRP2 376 User Manual 1173 9157 02 03...
Page 422: ...Compatibility Information R S NRP2 404 User Manual 1173 9157 02 03...