
Current Section:
Delay Watering 55
Navigation:
Delay Watering
Next
Rain Delay
Calender Day Off
PGM Water Window
Calender Day Off
Done
Day 1:
Day 2:
Day 3:
Day 4:
8 Mar 2022
Unused
Unused
Unused
1
Turn the controller dial to Delay Watering
2
At the Delay Watering screen, press the key to select “
Calendar Day Off
”, then press
Next
.
3
The Calendar Day off screen appears, showing (up to 5) scheduled calendar days off in
chronological order. Unprogrammed days will show as Unused.
4
Press the and keys to set the Calendar Day Off date as desired.
5
Press the & buttons to set other days as desired.
•
Press and HOLD keys to accelerate settings.
•
Calendar Day Off affects ALL programs and stations, including non-irrigation stations. Consider not using
this feature if any of your programs include essential functions such as door locks or sports field lighting.
12.4.3 Program Water Window
You can specify certain times of the day/night when irrigation is allowed.
Watering is not allowed outside these “Water Windows”. This is helpful to comply with local
regulations which may prohibit irrigation during certain hours.
NOTICE
Be sure a Water Window is sufficient to allow irrigation programs to run completely. Irrigation scheduled
outside the Water Window will be paused and will resume when the Water Window opens again. This can
cause irrigation programs to “stack” and eventually create an alarm condition if the controller stacks 8 or
more programs.
•
Water windows can be scheduled to cross midnight. For example, a Water Window can start at 10:00 PM
and continue until 4:00 AM the next morning. Be sure your Watering Start Times are set to occur within the
Water Window. See “
” for more details.