![Rain Bird ESP-LXIVM Series Installation, Programming & Operation Manual Download Page 72](http://html1.mh-extra.com/html/rain-bird/esp-lxivm-series/esp-lxivm-series_installation-programming-and-operation-manual_3522749072.webp)
72
ESP-LXIVM Series Controllers
Calendar Day Off
The LX-IVM controller can be programmed to suspend irrigation on a
particular calendar date, for up to 5 days of the year.
You can schedule certain days of the year as Non-irrigation, such as
holidays when landscape may receive heavy use.
B
NOTE: Calendar Day Off dates can only be selected 365 days in
advance. Then once a Calendar Day Off has passed, it will be
removed from the list and must be reprogrammed for the fol-
lowing year if desired.
Turn the controller dial to Delay Watering
A
At the Delay Watering screen, press the Down Arrow key to select
Calendar Day Off, then press Next.
B
The Calendar Day off screen appears, showing (up to 5) sched-
uled calendar days off in chronological order. Unprogrammed
days will show as Unused.
A
Delay Watering
Next
Rain Delay
Calendar Day Off
PGM Water Window
B
Calendar Day Off
Unused
Day 2:
Unused
Day 3:
Unused
Day 4:
Unused
Day 5:
Day 1:
Done
5 Jul 2019
C
Press the + and – keys to set the Calendar Day Off date as desired.
Press the Next and Back buttons to set other days as desired.
• Press and HOLD keys to accelerate settings.
C
Calendar Day Off
Unused
Day 2:
Unused
Day 3:
Unused
Day 4:
Unused
Day 5:
4 Jul 2019
Day 1:
Done
B
NOTE: Calendar Day Off affects ALL programs and stations,
including non-irrigation stations. Consider not using this fea-
ture if any of your programs include essential functions such as
door locks or sports field lighting.