background image

5.1. Platform Assembly

5. PLATFORM COMPONENTS ASSEMBLY

1

Connect the platform to the terminal via a suitable cable.

Insert weighing pan receivers into lever 
seats. Install the receiver with the grounding 
spring in the seat of your choice.

2

Models: 

HRP Platforms

Check if the grounding plate is 
correctly positioned.

Make sure that the grounding 
plate extends above the 
platform.

Models: 

F1 | C2-C3 | H1-H6 1-Load-Cell Platforms

Check if the grounding spring is 
correctly positioned.

Make sure that the grounding 
spring protrudes slightly from 
the hole.

Grounding 

foot

Models: 

D2 1-Load-Cell Platforms

Check if the grounding plate is 
screwed on securely.

Attach the grounded copper 
wire to the plate.

Summary of Contents for HRP

Page 1: ...Quick Start HRP High Resolution Platforms 1 Load Cell Platforms 4 Load Cell Platforms Weighing Platforms IMMB 14 01 01 22 EN ...

Page 2: ...To view the full user manual go to the website or scan the QR code radwag com en manuals 9584 HRP ...

Page 3: ... 1 Platform 1 Platform x1 Ramp 1 Ramp Platforms HRP High Resolution Platforms 4 Load Cell Platforms Platform 1 F1 C2 C3 H1 H6 1 Load Cell Platforms D2 1 Load Cell Platforms Scale 1 Weighing pan 1 Grounding foot 1 Foot 3 ...

Page 4: ...table results it is recommended to use an anti vibration table 10 o C 14o F 104 o F 40 o C Place the scale away from heat sources Avoid exposing the scale to the sunlight Avoid exposing the scale to the influ ence of a magnetic field Do not weigh magnetic substances Not intended for use within EX zones Not intended for weighing explosive or flammable substances 2 1 3 HRP Platforms F1 C2 C3 H1 H6 1...

Page 5: ... Platforms 2 1 3 HRP High Resolution Platforms 2 1 3 4 Load Cell Platforms 4 2 Grounding Check Check if the grounding spring is correctly positioned Make sure that the grounding spring protrudes slightly from the hole Models HRP 4 1 Transport Lock Removal ...

Page 6: ...ls HRP Platforms Check if the grounding plate is correctly positioned Make sure that the grounding plate extends above the platform Models F1 C2 C3 H1 H6 1 Load Cell Platforms Check if the grounding spring is correctly positioned Make sure that the grounding spring protrudes slightly from the hole Grounding foot Models D2 1 Load Cell Platforms Check if the grounding plate is screwed on securely At...

Page 7: ...t Assembly If Not Assembled Screw the base of the foot onto the foot pin Models D2 1 Load Cell Platforms Install the grounding foot in the seat of your choice Install the bracket for the weighing terminal Install the weighing pan 2 1 3 ...

Page 8: ... whole thing with a steel locking ring Attach the feet to the scale Fix the steel clamping rings to the floor and install the ramp 5 4 Post Assembly Scale Base Models F1 C2 C3 1 Load Cell Platforms 2 1 Screw the support under the post Screw the post to the scale base for C2 and C3 platforms for F1 platforms Screw the post to the scale base ...

Page 9: ... suitable cable or communication interface 1 2 6 2 LEVELLING To level the scale turn its feet keep turning the feet until an air bubble takes the central position HRP High Resolution Platforms Place the device on the workstation and leave it until it reaches ambient temperature To level the scale turn its feet keep turning the feet until an air bubble takes the central position F1 C2 C3 H1 H6 1 Lo...

Page 10: ...eep turning the feet until an air bubble takes the central position PIN PIN FOOT BASE Adjustment span of the scale level is narrow therefore the correct level is obtained using steel washers which are to be put under the feet Place the spirit level on the weighing pan To level the scale turn its feet keep turning the feet until an air bub ble takes the central position ...

Page 11: ... and cable entries Thoroughly remove detergents It is recommended to cover the terminal before further cleaning 7 4 Weighing Pan Cleaning The weighing pan is usually the most soiled Clean it thoroughly Lift disassemble and wash underneath if possible 7 1 Preparing for Cleaning 7 CLEANING AND MAINTENANCE Switch the scale off Unplug the scale from the mains Remove elements that are not part of the s...

Page 12: ...rgents 7 8 Platform Levelling Place the weighing platform on a dry floor Check the levelling Adjust the level of the weighing platform if necessary Install the weighing pan if removed Connect to the mains when completely dry Clean and disinfect all surfaces immediately after the weighing process Wash the platform feet and the floor underneath the platform Thoroughly remove detergents from the weig...

Reviews: