background image

Page 6 

2Post Flush Front Installation Instructions

Step 1. 

Install Rails: Installing this rail kit in a 2Post flush rack requires the 109-1841 Kit 

and a change to the pre-assembled rail configuration as follows (Note: this will 

require a 3/8” wrench or ratchet).

Remove the Angle Brackets and associated hardware from the pre-assembled 

rails. 

"Right" Rail in the new 2Post Flush Configuration

Rail in Supplied Configuration

Range 3" to 6.5" 

[76mm to 165mm]

New Hardware

Location

2 Post Flush 

Adapter Bracket

Angle Bracket

Pre-Set Range 26.5" to 30.4"

[673mm to 772mm]

Summary of Contents for 4Post

Page 1: ...4Post and 2Post Rails for Dell PowerEdge R810 Installation Instructions Kit P N 109 1737 109 1841 Patent s Pending 4Post Page 2 2Post Center Page 4 2Post Flush Page 6 ...

Page 2: ...rdware attaching the Rear Slider can achieve any depth from 16 to 36 406mm to 914mm The Angle Bracket may need to be removed Front of Rack 6 12 24 black cage nuts Rear of Rack 6 12 24 black cage nuts Angle Bracket Rear Sliding Bracket Pre Set Range 26 5 to 30 4 673mm to 772mm Kit Contents Kit Contents 1 Right Rail Assembly 1 Left Rail Assembly Mounting Hardware 12 10 32 x 500 Pan Head Screws 12 12...

Page 3: ...all the equipment using two people With one person on each side of the equipment slide the equipment onto the rails so the Equipment Mounting Nuts on each side slide into the Rail Slot on both sides Slide the equipment all the way in Tighten the 3 screws on the back of the left slide rail Slide the equipment out about 8 inches and tighten the 3 screws on the front of the left slide rail 3 Screws E...

Page 4: ...tion as follows Note this requires a 3 8 wrench or ratchet Step 2 Attach the rails to the rack Attach the Front and Rear of the rails to the 2Post rack using 3 Supplied Pan Head Screws on each side Tighten the front and rear screws on the right side rail Leave the front and rear screws on the left side rail slightly loose Rail Slot Angle Bracket Range 3 to 6 5 76mm to 165mm ...

Page 5: ...e the equipment onto the rails so the Equipment Mounting Nuts on each side slide into the Rail Slot on both sides Slide the equipment all the way in Tighten the 3 screws on the back of the left slide rail Slide the equipment out about 8 inches and tighten the 3 screws on the front of the left slide rail Equipment Mounting Nuts 3 on each side ...

Page 6: ...bled rail configuration as follows Note this will require a 3 8 wrench or ratchet Remove the Angle Brackets and associated hardware from the pre assembled rails Right Rail in the new 2Post Flush Configuration Rail in Supplied Configuration Range 3 to 6 5 76mm to 165mm New Hardware Location 2 Post Flush Adapter Bracket Angle Bracket Pre Set Range 26 5 to 30 4 673mm to 772mm ...

Page 7: ...f the rails to the 2Post rack using 3 supplied Pan Head Screws on each side Attach the 2Post Adapter Bracket per the 2 Post Racking System Instructions Attach the Rear of the rails to the adapter bracket using 3 12 24 Pan Head Screws and 3 12 24 Cage Nuts on each side 3 Screws Each Side 3 Screws Each Side ...

Page 8: ...t and rear screws on the right side rail Leave the front and rear screws on the left side rail slightly loose Step 4 Install the equipment using two people With on person on each side of the equipment slide the equipment onto the rails so the Equipment Mounting Nuts on each side slide into the Rail Slot on both sides Slide the equipment all the way in Tighten the 3 screws on the back of the left s...

Reviews: