74
RabbitCore RCM3750
To try out the update capability, click the upload link on the admin page and choose a
simple text file to replace
monitor.ztm
. Open another browser window and load the
main Web page. You will see that your text file has replaced the humidity monitor. To
restore the monitor, go back to the other window, click back to go to the upload page
again, and choose
HUMIDITY_MONITOR.ZHTML
to replace
monitor.ztm
, and click
Upload
.
When you refresh the page in your browser, you will see that the page has been restored.
You have successfully updated and restored your application's files remotely!
When you are finished with the
INTEGRATION.C
sample program, you need to follow a
special shutdown procedure before powering off to prevent any possible corruption of the
FAT file system. Press and hold switch S1 on the Prototyping Board until LED DS1 blinks
rapidly to indicate that it is now safe to turn the RCM3750 off. This procedure can be
modified by the user to provide other application-specific shutdown tasks.
6.7 Where Do I Go From Here?
NOTE:
If you purchased your RCM3750 through a distributor or through a Rabbit Semi-
conductor partner, contact the distributor or partner first for technical support.
If there are any problems at this point:
•
Use the Dynamic C
Help
menu to get further assistance with Dynamic C.
•
Check the Rabbit Semiconductor Technical Bulletin Board at
.
•
Use the Technical Support e-mail form at
.
If the sample programs ran fine, you are now ready to go on.
Additional sample programs are described in the
Dynamic C TCP/IP User’s Manual
.
Please refer to the
Dynamic C TCP/IP User’s Manual
to develop your own applications.
An Introduction to TCP/IP
provides background information on TCP/IP, and is available
on the CD and on our
Summary of Contents for RabbitCore
Page 6: ...RabbitCore RCM3750...
Page 40: ...34 RabbitCore RCM3750...
Page 64: ...58 RabbitCore RCM3750...
Page 126: ...120 RabbitCore RCM3750...
Page 162: ...156 RabbitCore RCM3750...
Page 172: ......