
1of3
Assembly Instruction Sheet #IS-PO9140
_R1
For Style PO9140XX
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,
.
.
.
Please go to
for product cleaning tips. Go to the
selection.
30-45 minutes
Identify and inspect all parts before beginning installation. Check package content list and diagrams below to be sure all parts are
present. If any parts are missing or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer service for replacement
parts.
www.quoizel.com
Care + Maintenance
Estimated Assembly Time:
Preparation:
Tools Required:
Flathead screwdriver, Phillips screwdriver, Shovel, Electrical tape, Wire cutter, Safety glasses, Wire strippers and proper length
wires (not supplied).
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
2016 QuoizelInc.
RevisedDate:2016-10-24
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184
or visit us on-line at www.quoizel.com
Package Contents
B
Small Allen Wrench
x 1
A
Big Allen Wrench
x 1
C
Anchor Bracket
x 1
D
Allen Bolt
x 3
E
Lock Ball
x 3
F
Washer
x 3
Lock Washer
x 3
G
Hex Nut
x 3
H
Anchor Bolt
x 3
I
J
Allen Set Screw
x 4
K
Post Fitter
x 1
L
Upper Post
x 1
M
Middle Post
x 1
N
Bottom Post
x 1
STEP 1
Assemble Anchor Bolts to the Anchor Bracket
-
A. Remove all Lock Washers (G), Hex Nuts (H) and Lock Balls (E) from
the Anchor Bolts (I).
B. Screw the threaded end of each Anchor Bolt (I) in the Mounting
Bracket (C) making sure to that the Anchor Bolt (I) is 1.75” to 2”
extended from the bottom of the Bracket (C).
C. Place a Lock Washer (G) over the Anchor Bolt (I) and then thread the
Hex Nut (H) onto each Anchor bolt (I). Securing the Bracket (C) in
place maintaining the 1.75”-2” length of the Anchor Bolt (I).
1.75” - 2”
H
G
C
I
C
G
H
I
Figure 1
STEP 2
Install Anchor
Bolts in the ground
-
A. Dig a hole in the ground at
the desired location for the
Post Mount.
B. Use cement to secure the
Anchor Bolts (I) into the
ground making sure that
the Bracket (C) is flush on
top of the cement and level
Anchor at the desired
grade with the ground. This
is the base for the Post
Mount.
Tube
Cement
Earth
Earth
Wires
1.75” - 2”
Dia. 9-11/16”
Bolt
Bolt Circle
C
I
Figure 2