
Instruction Book
96
9828 0934 73
Installation proposal, by-pass pipe and valve
Reference
Description
1
The dryer should be installed on a level floor suitable for taking its weight.
2a
A general-purpose filter which traps solid particles down to 1 micron with a max. oil carry-
over of 0.1 mg/m
3
(0.1 ppm) can be installed.
2c
A high-efficiency filter, may be installed downstream of the refrigerant dryer. This filter traps
particles down to 0.01 micron with a max. oil carry-over of 0.01 mg/m
3
(0.01 ppm).
3
Air receiver with condensate drain.
4
Pressure gauge
5
Condensate drain
6
Dryer outlet valve
7
By-pass system
8
By-pass valve
9
Dryer inlet valve
10
Electronic water drain
4.3 Installation instructions
Procedure
The dryers are designed for indoor use only.