Section 4 – Control Items
Parts List
Swashplate
Washout Arms
Washout Base
Antirotation guide pin
Washout link x 2
M2x12 Pan head screw x 2
M3x3 Set Screw x 1
M3x6 Pivot studs x 2
M3x10 Cap head screws
M3x5x1 Spacer x 2
Install the antirotation pin/elevator ball
on to the swashplate. Install the two
sim balls on to the the swashplate as
shown. Locate the swashplate and
slide it on the main shaft first.
Next locate the washout base, arms,
links, M3x6 pivot studs, M3x10 cap
head screws, M3x5x1 spacers, and
M2x12 pan head screws. First slide an
M3x8 cap head screw through each
arm. Note which direction the screw
should go through the arm in the
picture. Slide an M3x5x1 on each bolt
and attach them to the base.
Next attach an M3x6 pivot stud to each
of the washout arms. Finally attach a
washout link to each arm with an
M2x12 pan head screw. Next slide the
washout onto the main shaft with the
protruding side going down first.
Attach the washout links to the longer
pivot studs on the inner ring of the
swashplate.
17