Connecting Power
Setup
20
CubiScan 125
Connecting Power
Take the following steps to connect power to the CubiScan 125.
1. Locate the AC power cord (supplied), and connect it to the
power connection on the left side of the controller box, as
shown below.
2. Route the AC power cord under the CubiScan 125 base so it
cannot be crushed, bent, or pulled loose.
3. Connect the other end of the AC power cord to a standard power
outlet.
4. Use the power switch on the left side of the controller box
(shown above) to turn the CubiScan 125 on and off.
N
OTE
The CubiScan 125 should be powered on before running the Qbit
program to cube and weigh packages.
Figure 14
Connecting Power
Summary of Contents for CubiScan 125
Page 8: ...Table of Contents iv CubiScan 125 Notes...
Page 39: ...Setup Connecting to a Computer or Network CubiScan 125 29 13 Click the Hardware tab...
Page 44: ...Setup Checklist Setup 34 CubiScan 125 Notes...
Page 90: ...Computer Error Messages Troubleshooting 80 CubiScan 125 Notes...
Page 124: ...Parts List 114 CubiScan 125 Notes...