
QUANTECH
23
FORM QWC4-NM1 (221)
ISSUE DATE: 02/28/2021
3
Observe the following precautions:
•
Notify the nearest Quantech office in ample time
for a Quantech representative to observe rigging
the unit to its operating position and the assembly
of its components. Refer to the
QWC4 Installation
Checklist (Form QWC4-CL1)
for detailed instruc-
tions. Do not dismantle or unwrap the chiller for
any reason unless advised by a Quantech repre-
sentative.
•
Do not make final power supply connections to
the compressor motor drive or control center.
• Do not open valves or connections under any cir-
cumstances.
• Do not charge the unit with refrigerant.
• Do not attempt to start the system.
• Do not run hot water (110°F/43°C max) or steam
through the evaporator or condenser at any time.
SHIPMENT AND STORAGE
To ensure consistent quality and maximum reliability,
all units are tested and inspected before leaving the fac-
tory. The chiller may be ordered and shipped in any of
the following forms:
•
Form 1
(shipped assembled with refrigerant
charge)
•
Form 2
(shipped assembled without refrigerant
charge)
•
Form 7
(shipped in split assemblies without re-
frigerant)
• Miscellaneous loose items are shipped with all
forms.
When shipping a Form 2 or Form 7 unit,
make arrangements with the nearest
Quantech Field Service Office to make
sure the refrigerant is on-site when the
unit is ready to be charged.
SECTION 3 - HANDLING, STORAGE, INSTALLATION, AND REASSEMBLY
Rigging and lifting should only be done by a professional rigger in accordance with a written rig-
ging and lifting plan. The most appropriate rigging and lifting method will depend on job specific
factors, such as the rigging equipment available and site needs. Therefore, a professional rigger
must determine the rigging and lifting method to be used, and it is beyond the scope of this manual
to specify rigging and lifting details.
LD19197
Summary of Contents for QWC4
Page 14: ...QUANTECH 14 FORM QWC4 NM1 221 ISSUE DATE 02 28 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 64: ...QUANTECH 64 FORM QWC4 NM1 221 ISSUE DATE 02 28 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 82: ...QUANTECH 82 FORM QWC4 NM1 221 ISSUE DATE 02 28 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 130: ...QUANTECH 130 FORM QWC4 NM1 221 ISSUE DATE 02 28 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 146: ...QUANTECH 146 FORM QWC4 NM1 221 ISSUE DATE 02 28 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 152: ...QUANTECH 152 FORM QWC4 NM1 221 ISSUE DATE 02 28 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 155: ...QUANTECH 155 NOTES...