SECTION 6 - COMMISSIONING
QUANTECH
93
FORM QTC4-NM1
ISSUE DATE: 4/2/2018
6
for more details on programming the date
and time).
Start/Stop Schedule
Program the daily and holiday start/stop by pressing
for more details on programming
the date and time).
Setpoint and Remote Offset
Set the required leaving chilled liquid temperature
setpoint and Control Range under the SETPOINTS key.
The chilled liquid temperature control settings need to
be set according to the required operating conditions.
If remote temperature reset (offset) is to be used, the
maximum reset required must be programmed by
pressing the SETPOINTS key (See
FIRST TIME START UP
During the commissioning period there
should be sufficient heat load to run
the unit under stable full load operation
to enable the unit controls, and system
operation to be set up correctly, and a
commissioning log taken.
Interlocks
Verify that liquid is flowing through the evaporator
and that heat load is present. Ensure that any remote
run interlocks are in the run position and that the Daily
Schedule requires the unit to run or is overridden.
Unit Switch
Place the UNIT switch on the keypad to the ON position.
Startup
Press the SYSTEM SWITCHES key and place the
system switch for System 1 to the ON position. There
may be a few seconds delay before the first compres-
sor starts because of the anti-recycle timer). Be ready
when each compressor starts, to switch the UNIT
switch OFF immediately, if any unusual noises or
other adverse conditions develop.
When a compressor is running, the controller monitors
oil pressure, motor current, and various other system
parameters such as discharge pressure, chilled liquid
temperature, etc. Should any problems occur; the con-
trol system will immediately take appropriate action
and display the nature of the fault.
Oil Pressure
When a compressor starts, press the relevant “System
Pressures” key and verify that oil differential pressure
(oil pressure-suction pressure) develops immediately.
If oil pressure does not develop, the automatic con-
trols will shut down the compressor. Under no circum-
stances should a restart attempt be made on a compres-
sor, which does not develop oil pressure immediately.
Switch the UNIT switch to the OFF position.
Loading
Once the unit has been started, all operations are fully
automatic. After an initial period at minimum capacity,
the control system will adjust the unit load depending
on the chilled liquid temperature and rate of tempera-
ture change. If a high heat load is present, the control-
ler will increase the speed of the compressor(s).
Condenser and Fan Rotation
Once a compressor is running, discharge pressure
rises as refrigerant is pumped into the air-cooled con-
denser coils. This pressure is controlled by stages of
fans to ensure maximum unit efficiency while main-
taining sufficient pressure for correct operation of the
condensers and the lubrication system.
As discharge pressure rises, the condenser fans operate
in stages or ramp up in speed to control the pressure.
Verify that the fans operate in the correct direction of
rotation and operation is correct for the type of unit.
System Charge
Check system charge at steady full compressor load
only. It is important that all fans are running for the
system. The refrigerant level in the evaporator should
be about in the middle of the sight glass. Unless
levels are at the bottom or the top of the sight glass,
they should not cause concern or require adding or
removing charge.
GENERAL OPERATION
After completion of the above checks for System 1,
switch OFF the SYS 1 switch on the keypad and repeat
the process for each subsequent system. When all run
correctly, stop the unit, switch all applicable switches
to the ‘ON’ position and restart the unit.
Assure all checks are completed in the Equipment
Pre - Startup and Startup Checklist. The chiller is then
ready to be placed into operation.
Summary of Contents for QTC4 STYLE A Series
Page 22: ...QUANTECH 22 FORM QTC4 NM1 ISSUE DATE 03 07 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...QUANTECH 34 FORM QTC4 NM1 ISSUE DATE 03 07 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 56: ...QUANTECH 56 FORM QTC4 NM1 ISSUE DATE 03 07 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 90: ...QUANTECH 90 FORM QTC4 NM1 ISSUE DATE 03 07 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 148: ...QUANTECH 148 FORM QTC4 NM1 ISSUE DATE 03 07 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 160: ...QUANTECH 160 FORM QTC4 NM1 ISSUE DATE 03 07 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 163: ...QUANTECH 163 FORM QTC4 NM1 ISSUE DATE 4 2 2018 NOTES...