background image

PAGE 8

QualityWaterForLess.com

Help: 888-426-5001

2   ›P l ac I n G   a n d   fI l l I n G   t H e   ta n k

1)  Choose the final location for your water softener 

tank and place the tank upright and level on the 
surface. Filling the tank may be necessary on 
some systems. Your tank may have also come 
pre-filled, and in this case you only need to un-
screw the protective cap as shown in 

Figure 8-a

2) 

If your tank is not filled

, place the riser tube 

into the tank as shown in 

Figure 8-B

. Please 

make sure that the riser tube seats into the 
bottom of the tank and that the top of the tube is 
flush with the top of the tank opening 

f I G u r e   8 - a

f I G u r e   8 - b

›Pr e - I n s ta l l at I o n

Before assembly of your new system, be sure that the following conditions have been met for the place-
ment of your system:

• 

Level, firm surface, such as concrete, on which 
to place the softener tank and salt tank (also 
known as a 

brine

 tank)

• 

Un-switched power source, standard US plug, 
120v 60hz (the softener system includes a  
5 ft power cord and plug)

• 

Access to the water main coming into your 
home. You will need to install the softener at 
this point to assure that water for the home is 
going through the system

• 

Nearby floor drain or standpipe to connect to the 
softener for use during each regeneration

Well 

Pump or

City 

Meter

Water

Heater

Bypass

Bath

Sink

Toilet

Kitchen

Spigot

Spigot

Softener

Drain Line

Hard Water

Soft Water

Overflow

(Optional)

Floor

Drain

Summary of Contents for Fleck 2510

Page 1: ...v1 0 Fleck 2510 Metered Water Softener Install ation Guide...

Page 2: ...s com We have put together these instructions as reference and to be used as general installation guidelines It is always recommended that a licensed plumber perform all instal lation work according t...

Page 3: ...on and Filling the Tank Page 9 Installing the Fleck 2510 SXT Valve onto the Tank Page 10 Plumbing the Fleck 2510 SXT Valve into your Home Page 11 Making the Brine Tank Connection Page 13 Making the Dr...

Page 4: ...es of H hARDNESS C unit CAPACITY and Bf bRINE FILL The remaining values that are already filled in are general standards for all softener sizes and hardness levels MASTER PROGRAMMING MODE To enter in...

Page 5: ...t Unit Capacity listed on the table on page 7 With the front cover off of your control valve and while looking at the panel on the right side pull out and rotate the dial and line up your gallon capac...

Page 6: ...7 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 H Compensated Hardness Your Iron results should also be measured in either PPM or mg L Take your lev...

Page 7: ...25 gpg 20K 5 Min 7 5 lbs Grid Grid NO GRID NO GRID 25 gpg 24K 7 Min 11 25 lbs Grid 3 Legs Grid Grid Grid 32K 1 0 cu ft 9x48 0 12 gpg 20K 4 Min 6 lbs Grid NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 1...

Page 8: ...ig u r e 8 a Fig u r e 8 b pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Page 9: ...e 9 A Fig u r e 9 B 3 Installing the fleck 2510 sx t Valve 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lu bricate the inner and outer o rings on the bot...

Page 10: ...lines and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve byp...

Page 11: ...e the brine well and remove the cap You may also take this moment to prepare and insert the brine support grid determined from pages 6 and 7 Then pull the 474 Brine Float Assembly out of the brine wel...

Page 12: ...e to recut the end of the tube each time you remove it to ensure a proper seal when the tube is inserted 8 Finally use inner diameter I D tubing to connect the drain barb fitting on the brine tank to...

Page 13: ...ure 13 C Be sure that the fitting is fully inserted into the drain port by clicking it into place 4 Reinsert the drain fitting pin to lock the DLFC barbed drain fitting into the Fleck 2510 SXT con tro...

Page 14: ...the UP or DOWN button as shown in Figure 14 B i Be careful to confirm the presence of the PM symbol in the top right corner You may hold the button to allow the time to scroll faster Once the time dis...

Page 15: ...culated on pages 6 and 7 and press the REGEN button as shown in Figure 15 C 10 The display should now show H 20 This indicates the Hardness is 20 gpg i Use the UP or DOWN button to change this value t...

Page 16: ...ll regenerate in 14 days if the meter has not measured water consumption to have reached the calculated capacity Do not change this value and press the REGEN button 14 The display should now show RT 2...

Page 17: ...will now exit Master Programming mode and the display should now show the time of day followed by the number of gallons remain ing Now change the time of day to your current time with either the UP o...

Page 18: ...leaks If you notice a leak originating from the drain line connection return to page 13 to review preparing the drain con nection If you notice a leak originating from the brine line connections retur...

Reviews: