Quality Water For Less Fleck 2510 Installation Manual Download Page 14

PAGE 14

QualityWaterForLess.com

Help: 888-426-5001

f I G u r e   14 - a

f I G u r e   14 - b

f I G u r e   14 - c

f I G u r e   14 - d

7   ›Pro G r a M M I n G   t H e   f l ec k   2 510   sx t   Va lV e

1)  Loosen the screw on the front of the valve and 

remove the valve front cover to expose the SXT 
controller and prepare for programming as seen 
in Figure 14-A 

2)  To begin programming, first plug in your 

2510SXT Valve to a nearby wall outlet. The 
system will illuminate 4 digits. The system will 
show the time of day and the amount of gallons 
remaining before the next regneration. This 
display will switch between these values about 
every 10 seconds

3)  Set the time on the system to 12:01 PM by 

pressing either the UP or DOWN button as 
shown in Figure 14-B. 

i

 Be careful to confirm 

the presence of the PM symbol in the top 

right corner.

 You may hold the button to allow 

the time to scroll faster. Once the time display is 
set to 12:01 PM, press the REGEN button once 
as shown in Figure 14-C

4)  To enter MASTER PROGRAMMING MODE, 

press the UP and DOWN buttons TOGETHER 
and HOLD both for 5 seconds as shown in  
Figure 14-D 

f I G u r e   14 - e

f I G u r e   14 - f

5)  The display should now show 

dF / Gal

 as shown 

in Figure 14-E. This indicates U.S. Operational 
Mode measuring consumption in gallons. 

do 

not change this value and press the reGen 

button once to advance to the next setting

6)  The display should now show 

Vt / dF1b

 as 

shown in Figure 14-F. This indicates Regeneration 
Flow Downflow Single Backwash. Do not change 
this value and press the REGEN button to advance 
to the next setting

Summary of Contents for Fleck 2510

Page 1: ...v1 0 Fleck 2510 Metered Water Softener Install ation Guide...

Page 2: ...s com We have put together these instructions as reference and to be used as general installation guidelines It is always recommended that a licensed plumber perform all instal lation work according t...

Page 3: ...on and Filling the Tank Page 9 Installing the Fleck 2510 SXT Valve onto the Tank Page 10 Plumbing the Fleck 2510 SXT Valve into your Home Page 11 Making the Brine Tank Connection Page 13 Making the Dr...

Page 4: ...es of H hARDNESS C unit CAPACITY and Bf bRINE FILL The remaining values that are already filled in are general standards for all softener sizes and hardness levels MASTER PROGRAMMING MODE To enter in...

Page 5: ...t Unit Capacity listed on the table on page 7 With the front cover off of your control valve and while looking at the panel on the right side pull out and rotate the dial and line up your gallon capac...

Page 6: ...7 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 H Compensated Hardness Your Iron results should also be measured in either PPM or mg L Take your lev...

Page 7: ...25 gpg 20K 5 Min 7 5 lbs Grid Grid NO GRID NO GRID 25 gpg 24K 7 Min 11 25 lbs Grid 3 Legs Grid Grid Grid 32K 1 0 cu ft 9x48 0 12 gpg 20K 4 Min 6 lbs Grid NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 1...

Page 8: ...ig u r e 8 a Fig u r e 8 b pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Page 9: ...e 9 A Fig u r e 9 B 3 Installing the fleck 2510 sx t Valve 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lu bricate the inner and outer o rings on the bot...

Page 10: ...lines and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve byp...

Page 11: ...e the brine well and remove the cap You may also take this moment to prepare and insert the brine support grid determined from pages 6 and 7 Then pull the 474 Brine Float Assembly out of the brine wel...

Page 12: ...e to recut the end of the tube each time you remove it to ensure a proper seal when the tube is inserted 8 Finally use inner diameter I D tubing to connect the drain barb fitting on the brine tank to...

Page 13: ...ure 13 C Be sure that the fitting is fully inserted into the drain port by clicking it into place 4 Reinsert the drain fitting pin to lock the DLFC barbed drain fitting into the Fleck 2510 SXT con tro...

Page 14: ...the UP or DOWN button as shown in Figure 14 B i Be careful to confirm the presence of the PM symbol in the top right corner You may hold the button to allow the time to scroll faster Once the time dis...

Page 15: ...culated on pages 6 and 7 and press the REGEN button as shown in Figure 15 C 10 The display should now show H 20 This indicates the Hardness is 20 gpg i Use the UP or DOWN button to change this value t...

Page 16: ...ll regenerate in 14 days if the meter has not measured water consumption to have reached the calculated capacity Do not change this value and press the REGEN button 14 The display should now show RT 2...

Page 17: ...will now exit Master Programming mode and the display should now show the time of day followed by the number of gallons remain ing Now change the time of day to your current time with either the UP o...

Page 18: ...leaks If you notice a leak originating from the drain line connection return to page 13 to review preparing the drain con nection If you notice a leak originating from the brine line connections retur...

Reviews: