background image

PAGE 10

QualityWaterForLess.com

Help: 888-426-5001

4   ›P l u M b I n G   Yo u r   f l ec k   2 510   sx t   Va lV e

1)  Before beginning your installation, please first fa-

miliarize yourself with the IN and OUT ports on the 
Fleck 2510 SXT Meter Valve. 

In order to prevent 

damage to your home and to the softener 

system, install the softener according to the 

In and out arrows on the softener valve

2)  Locate the main shut-off valve for your house 

and turn it to the OFF position. If you have a 
private well, this valve should be near your well 
pressure tank. If you have a city water supply, 
your valve should be near your water meter

3)  Depressurize and drain your home of water by 

turning on all faucets and fixtures in your home, 
including those outside

4)  Pick your installation point and cut a section of 

pipe out to run to and from your softener. 

In 

most cases it is preferred to keep outside 

lines unSoFtened. If you wish to keep 

your outside lines unsoftened, you must 

plumb BYPaSS lines to run hard water to 

these fixtures

5)  Using soldered copper, PVC plastic pipe, or flex-

ible connections, plumb the system according to 
all local plumbing codes.

 

If using copper pipe, 

please pre-fabricate at least a 12” section 

of pipe for the In and out bound lines and 

use a wet rag on the lines being soldered to 

prevent heat damage during soldering

6)  Once all connections have been made, place the 

system into bypass by either using your existing 
3-valve bypass (if ordered with a YOKE adap-
tor), or by switching your included bypass ON (if 
ordered with a bypass)

7)  Next, gradually open your main valve and allow 

all air in your plumbing lines to escape slowly. 
Also, you may turn off all outside and inside 
faucets and fixtures

8)  Check for leaks at your plumbing site for signs 

of slow drips and rectify if necessary. 

Please do 

not take the softener out of BYPaSS as the 

installation is not completed yet. Please take 

this opportunity to check and re-check the In 

and out ports to make sure they are correct

f I G u r e   10 - c

5)  Assemble the plumbing adaptor to the valve as 

shown in Figure 10-C (your bypass/plumbing 
adapter model may vary). When assembling 
the clips back onto the valve, leave the first clip 
loose, tighten the second clip, and complete the 
assembly by tightening the first clip. 

i

 

Please 

lightly tighten the screws into the meter as 

overtightening will easily cause cracking

3)  Locate the plumbing adapter that was shipped 

with your system and disassemble the plumbing 
adaptor clips as shown in Figure 10-A

4)  Using the included silicone lubricant packet, lu-

bricate the o-rings on the Fleck 2510 SXT Meter 
Valve as shown in Figure 10-B

f I G u r e   10 - a

f I G u r e   10 - b

Summary of Contents for Fleck 2510

Page 1: ...v1 0 Fleck 2510 Metered Water Softener Install ation Guide...

Page 2: ...s com We have put together these instructions as reference and to be used as general installation guidelines It is always recommended that a licensed plumber perform all instal lation work according t...

Page 3: ...on and Filling the Tank Page 9 Installing the Fleck 2510 SXT Valve onto the Tank Page 10 Plumbing the Fleck 2510 SXT Valve into your Home Page 11 Making the Brine Tank Connection Page 13 Making the Dr...

Page 4: ...es of H hARDNESS C unit CAPACITY and Bf bRINE FILL The remaining values that are already filled in are general standards for all softener sizes and hardness levels MASTER PROGRAMMING MODE To enter in...

Page 5: ...t Unit Capacity listed on the table on page 7 With the front cover off of your control valve and while looking at the panel on the right side pull out and rotate the dial and line up your gallon capac...

Page 6: ...7 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 H Compensated Hardness Your Iron results should also be measured in either PPM or mg L Take your lev...

Page 7: ...25 gpg 20K 5 Min 7 5 lbs Grid Grid NO GRID NO GRID 25 gpg 24K 7 Min 11 25 lbs Grid 3 Legs Grid Grid Grid 32K 1 0 cu ft 9x48 0 12 gpg 20K 4 Min 6 lbs Grid NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 1...

Page 8: ...ig u r e 8 a Fig u r e 8 b pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Page 9: ...e 9 A Fig u r e 9 B 3 Installing the fleck 2510 sx t Valve 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lu bricate the inner and outer o rings on the bot...

Page 10: ...lines and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve byp...

Page 11: ...e the brine well and remove the cap You may also take this moment to prepare and insert the brine support grid determined from pages 6 and 7 Then pull the 474 Brine Float Assembly out of the brine wel...

Page 12: ...e to recut the end of the tube each time you remove it to ensure a proper seal when the tube is inserted 8 Finally use inner diameter I D tubing to connect the drain barb fitting on the brine tank to...

Page 13: ...ure 13 C Be sure that the fitting is fully inserted into the drain port by clicking it into place 4 Reinsert the drain fitting pin to lock the DLFC barbed drain fitting into the Fleck 2510 SXT con tro...

Page 14: ...the UP or DOWN button as shown in Figure 14 B i Be careful to confirm the presence of the PM symbol in the top right corner You may hold the button to allow the time to scroll faster Once the time dis...

Page 15: ...culated on pages 6 and 7 and press the REGEN button as shown in Figure 15 C 10 The display should now show H 20 This indicates the Hardness is 20 gpg i Use the UP or DOWN button to change this value t...

Page 16: ...ll regenerate in 14 days if the meter has not measured water consumption to have reached the calculated capacity Do not change this value and press the REGEN button 14 The display should now show RT 2...

Page 17: ...will now exit Master Programming mode and the display should now show the time of day followed by the number of gallons remain ing Now change the time of day to your current time with either the UP o...

Page 18: ...leaks If you notice a leak originating from the drain line connection return to page 13 to review preparing the drain con nection If you notice a leak originating from the brine line connections retur...

Reviews: