background image

Page  1

7033-308D

March 4, 2015

QUADRA-FIRE 3100 SERIES ACC WOOD BURNER INSTALLATION INSTRUCTIONS

QUADRA-FIRE 3100 SERIES ACC WOOD BURNER INSTALLATION INSTRUCTIONS

INSTALLATIONS TO COMPLY WITH AS/NZS2918:2001 

AND WILL REQUIRE A BUILDING CONSENT

IMPORTANT: Read all instructions carefully before starting installation.  Failure to follow these 

instructions may result in a 

fi

 re hazard and will void the warranty.

•  Fig. 3,4,5,6, 7 and Table 1,2,3,4 relate to installations with tested fl ue systems; as per 

AS/NZS 2918:2001 - 

Appendix F

, with a ceiling angle between 0° - 30° inclusive.

•  For installations with a ceiling angle greater than 30°, refer to Fig. 7 & 8 and 

AS/NZS 2918:2001 4.6.3(b)

•  Ceiling Plate may vary in size depending on ceiling angle.  Please specify ceiling pitch prior to ordering the 

ceiling plate.

•  Quadra-Fire 3100 series ACC wood burner’s are tested and approved to the N.Z. National Environmental 

Standards;

31M-ACC-AU 3100 Millenium Hardwood Certifi ed 

31LE-ACC-AU 3100 Limited Edition Hardwood Certifi ed

31ST-ACC-AU 3100 Step Top Hardwood Certifi ed

Particulate Emissions = 1.4 g/kg Space Heating Effi ciency = 71%

Model:

31M-ACC-AU

Model:

31ST-ACC-AU

Model:

31LE-ACC-AU

Summary of Contents for 31LE-ACC-AU

Page 1: ...ue systems as per AS NZS 2918 2001 Appendix F with a ceiling angle between 0 30 inclusive For installations with a ceiling angle greater than 30 refer to Fig 7 8 and AS NZS 2918 2001 4 6 3 b Ceiling Plate may vary in size depending on ceiling angle Please specify ceiling pitch prior to ordering the ceiling plate Quadra Fire 3100 series ACC wood burner s are tested and approved to the N Z National ...

Page 2: ...mfort of your hearth appliance Thank you for choosing Quadra Fire and Welcome to the Quadra Fire Family 3100 Series ACC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2015 2016 2017 INSTALLATION DATE QUADRA FIRE WOODFIRE COMPLIANCE LABEL R SERIAL NO 007050 7033 309 This appliance has been TESTED TO AS NZS4013 for Hardwood by HRL Technology Report HCMG 12 043A Date tested May 2012 MODEL QUADRA FIR...

Page 3: ...ire 3100 Millenium ACC Wood Burner Dimensions 616 mm 533 mm 254 mm 457 mm 273 mm 397 mm 379 mm 484 mm 749 mm 90 mm 25 mm 499 mm 406 mm 677 mm 46 mm Quadra Fire 3100 Limited Edition ACC Wood Burner Dimensions 978mm 1320mm 641mm 454mm 387mm 508mm 564mm 170mm 618mm 677mm ...

Page 4: ... are tested and comply with the minimum Floor Protector requirements of AS NZS 2918 2001 Note The minimum Floor Protector sizes are specified in the clearance chart see Table 1 2 A Floor Protector can include ceramic tiles with grouted joints fixed directly onto a wooden floor or a sheet of toughened glass panel steel or any other non combustible material laid directly onto a wooden floor If insta...

Page 5: ...om corner wall 756mm E Min floor protector front width 800mm F Min overall floor protector depth 1469mm CORNER POSITIONING 45 31M and 31LE Table 2 Fig 4 FIREBOX INSTALLATION 1 If a separate floor protector is being used position now Place the firebox on the floor protector to suit the minimum installation clearances See Fig 3 or 4 2 Seismically restrain the firebox and the floor protector to the f...

Page 6: ... 308D March 4 2015 3100 Series ACC Wood Burner Quadra Fire 31 Step Top ACC Wood Burner Dimensions 678mm 618mm 391mm 292mm 406mm 527mm 870mm 635mm 318mm 237mm C L 457mm 606mm 841mm 194mm 537mm 264mm 170mm 89mm C L ...

Page 7: ...d and comply with the minimum Floor Protector requirements of AS NZS 2918 2001 Note The minimum Floor Protector sizes are specified in the clearance chart see Table 3 4 A Floor Protector can include ceramic tiles with grouted joints fixed directly onto a wooden floor or a sheet of toughened glass panel steel or any other non combustible material laid directly onto a wooden floor If installed direc...

Page 8: ...rom corner wall 661mm E Min floor protector front width 800mm F Min overall floor protector depth 1335mm CORNER POSITIONING 45 31 Step Top Table 4 Fig 6 FIREBOX INSTALLATION 1 If a separate floor protector is being used position now Place the firebox on the floor protector to suit the minimum installation clearances See Fig 5 or 6 2 Seismically restrain the firebox and the floor protector to the f...

Page 9: ...g a phillips screwdriver to remove 4 screws on back Fig 14 1 3 Using a 11mm socket or wrench remove 4 wood lag bolts located in corners of pedestal base Fig 14 2 4 Lift stove off of pallet and reassemble sides Fig 14 1 Fig 14 2 DECORATIVE TILE INSTALLATION 1 Remove Tile frames from sides by lifting up and pulling away from stove Fig 14 3 2 Stack tiles in tile frame as shown Fig 14 4 3 Reattach Til...

Page 10: ...ceptable Solution from 01 07 05 5 Install the outer casing so that i lower end is flush with the underside of the ceiling material and ii with the addition of metal L brackets affix to the outer casing at 90 degrees secure the outer casing centrally to the ceiling and roof nogs Alternatively substitute the L brackets for 25mm thick non heat sensitive packers Secure the outer casing through the pac...

Page 11: ... combustible material Non combustible material Hebel block or 12mm Promina board or similar under the flashing 25 25 Approved Flashing Roof Line Inner Casing 200mm above roof line Outer Casing Inner Casing 25 Internal Swage 25 25 12 5 Vented Ceiling Plate Pioneer Double Flue Shield Flue Pipe C L C L Quadra fire Millennium Floor The flue crimp must be cut so the swage half moon bulge after the crim...

Page 12: ...ard distance of casing and 3 x ø flue distance of the ceiling plate ADD Cowl Casing Cover Spider Bracket Approved Flashing A Ceiling Plate Batten A 3 x Ø flue pipe Ceiling flue pipe Ø Fig 7 ADD Cowl AS NZS2918 2001 Un tested flue with sloped ceiling penetration greater than 30 from horizontal A 25mm 4 6 3 b Fig 4 6 3 x ø flue from active flue to heat sensitive surface Casing Cover Spider Bracket A...

Page 13: ...e entral tongue to locate inside the flue outlet only Two tabs are provided and if folded back at 90 degrees the bracket and Flue Mounted Shield will mount lower onto the appliance The Flue Mounted Shield then locates into the two notches provided n bracket 5B as illustated 6 Once the Flue Mounted Shield is fitted in position onto either of the two lower mounting brackets check to ensure a large g...

Page 14: ...TION IS CONSIDERED THE MAN UFACTURER SHOULD BE CONSULTED IN THE FIRST INSTANCE CAUTIONS CRACKED AND BROKEN COMPONENTS e g GLASS PANELS OR CERAMIC TILES MAY RENDER THE INSTALLATION UNSAFE WARNING ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS NZS 4013 WARNING DO NOT USE FLAMMABLE LIQUIDS OR AEROSOLS TO START OR REKIN DL...

Page 15: ...e under this manufacturer s warranty begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distributor whichever occurs earlier The warranty period for this manufacturer s warranty shall commence no later than 24 months following the date of product shipment from HHT regardless of the installation or occupancy date...

Page 16: ...Notes DO NOT DISCARD THIS MANUAL CAUTION Important operating and maintenance instruc tions included Leave this manual with party responsible for use and operation Read understand and follow these instruc tions for safe installa tion and operation DO NOT DISCARD Please contact your Quadra Fire dealer with any questions or concerns For the number of your nearest Quadra Fire dealer log onto www quadr...

Reviews: