© 2011 Neopost USA Inc. All rights reserved. No part of this document may be reproduced or distributed in any form or by any means.
IM | IS 280 iMeter™ Postage Meter
Replacement Part Guide – PSD
For interactive step by step instructions, visit:
www.neopostinc.com/280helpdesk/
(For Neopost Customers)
www.haslerinc.com/280helpdesk/
(For Hasler Customers)
The following steps will guide you through the removal of the PSD (Postal Security Device) and
installation of a new PSD.
Replacing The PSD
PSD Components
The following steps are performed when the PSD
needs to be replaced.
1. Withdrawing the PSD.
2. Installing the new PSD into to system.
3. Returning the old PSD.
4. Swapping the PSD.
Withdrawing The PSD
1. Press the Sleep/Wake
button. The power indicator
light will become green.
6. Press the down arrow
button to select
“Maintenance”.
Press “OK”.
2. From the Homescreen,
press the “MENU” button.
7. Press the down arrow
button to select
“Processes”.
Press “OK”.
3. Press the down arrow
button until “Supervisor” is
highlighted.
8. Press “OK” to continue with
this process.
4. Once “Supervisor” is
highlighted, press “OK”.
9. Press the down arrow
button to select “Withdraw
PSD”.
Press “OK”.
5. Enter the Supervisor PIN
code, “09430”.
10. Press “Next” to continue
to withdraw the meter
(PSD).
IM | IS-280
iMeter™
Postage Meter
PSD