QSW-6300 Series Switches Hardware Installation and Reference Guide
Installing the Switch
33
3.7.1. Simple Bundling Steps
Bind the drooping part of the fibers and twisted pairs of each board, and lead them to
both sides of the chassis for convenience.
On the both sides of the chassis, fasten the fibers and twisted pairs to the cabinet cable
management ring or cabling chute.
For the power cables, you should bundle them closely along the chassis downward in a
straight line wherever possible.
3.8. Verifying Installation
Note:
Before verifying the installation, cut off the power supply to avoid any personal injury or damage
to the component due to connection errors.
Verify that the ground cable is connected.
Verify that the cables and the power cord are properly connected.
Verify that the cablings are all indoor. If any outdoor cabling is found, check the
connection to lightening protection power strip of AC power or lightening arrester of
Ethernet port.
Maintain a minimum clearance of 10 cm (3.94 in.) around the chassis to facilitate heat
dissipation.