QSW-4600
Series Switch Hardware Installation and Reference Guide
23
www.qtech.ru
Figure 4-4
5. After setting the parameters, click
OK
to enter the hyper terminal interface.
4.2 Startup Check
4.2.1 Checking before the Device is Powered on
The switch is fully grounded.
The power cable is correctly connected.
The power supply voltage complies with the requirement of the switch.
The control cable of the PC is properly connected to the console port of the switch. The HyperTerminal is started and
the parameter settings are correct.
4.2.2 Checking after Program Startup (Recommended)
After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up
configurations.
Check whether information is displayed on the terminal interface.