QIAsymphony SP/AS Consolidated Operating Guide 12/2017
39
When an assay run has been defined, press the “E+R” button to open the
Loading Information
screen.
This button flashes yellow if there are insufficient adapters or rack positions
available for the defined runs. In this situation, if you press the button, a
message appears informing the user why it is not possible to start the run.
When an assay run has finished, the “A” button flashes green. In this
situation, if you press the button, a message appears informing the user that
the run has been completed. Press
OK
to confirm the message.
If there are insufficient assay racks available for the selected assays, this
button flashes yellow. In this situation, if you press the button, a message
appears informing the user why it is not possible to start the run.
5.1.2
Tab menus
The
Integrated Run
tab is used to:
Define integrated runs
View information about the status of defined integrated runs
(i.e., progress, batch status, estimated time remaining, and the next user
interaction required for each integrated batch)
The
Sample Preparation
tab is used for running protocols, to control the
individual drawers, for logging in to the instrument, and for the Wizard.
The
Assay Setup
tab is used to define independent runs on the QIAsymphony
AS. In this tab, the user can:
Assign Assay Parameter Sets
View information about the QIAsymphony AS (including the progress and
status of assay setup)
Remove completed assays
The
Tools
tab provides access to several menus required for operation of
QIAsymphony SP/AS instruments.
Summary of Contents for QIAsymphony SP
Page 213: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 213 This page intentionally left blank...
Page 214: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 214 This page intentionally left blank...
Page 216: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 216 www qiagen com...