QIAsymphony SP/AS Consolidated Operating Guide 12/2017
56
We recommend loading items into the “Waste” drawer in the following order:
1.
Insert empty liquid waste container (be sure to remove lid before placing into the drawer).
2.
Insert tip chute.
3.
Insert tip park station.
4.
Insert empty unit boxes (make sure there is an empty unit box in slot 4).
5.
Install empty tip disposal bag.
8.2.1
Tip park station
The tip park station is on top of the liquid waste container. It channels liquid waste from the filter
tips into the liquid waste container and also enables temporary storage of filter-tips that will be
reused in a subsequent protocol step.
To load the tip park station into the “Waste” drawer, follow the steps below.
1.
Open the “Waste” drawer.
2.
Ensure that the tip park station is properly inserted; otherwise an error may occur during the
inventory scan.
The tip park station will be automatically detected during the inventory scan.
8.2.2
Liquid waste container
The liquid waste container is used to collect all liquid waste generated during sample
preparation.
To load the liquid waste container into the “Waste” drawer, follow the steps below.
1.
Open the drawer.
2.
Place the liquid waste container at the rear right.
3.
Gently press the container downwards to put it properly in place.
Important
Make sure to remove the lid from the liquid waste container before you load the
container into the drawer.
Important
Make sure to empty the liquid waste container at the end of each run.
Summary of Contents for QIAsymphony AS
Page 213: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 213 This page intentionally left blank...
Page 214: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 214 This page intentionally left blank...
Page 216: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 216 www qiagen com...