background image

Q.MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs

4

WARRANTY AND NOTES

WARRANTY/PRODUCT LIABILITY (EXCLUSION)

The dimensioning notes contained in this manual are merely practical tips. Binding assembly 
rack statics can be created using the program 

Q CELLS ROOFTOP PLANNER

.

As an installation company, you are responsible for the correct execution of the installation. 

Hanwha Q CELLS GmbH 

is not liable for the dimensioning information contained in 

commercial plant quotations.

As an installation company, you are responsible for the mechanical durability of the mounted 
interface connections on the building envelope, and especially for their tightness. 
The components supplied by 

Hanwha Q CELLS GmbH 

are designed for this purpose 

in accordance with the expected loads and the current state of the art. In this context, 
you must specify all general technical conditions in writing in the project registration form 
(details of the supporting structure, snow load zone, building heights, wind loads, etc.) 
within the framework of the inquiry/order sent to 

Hanwha Q CELLS GmbH

.

Hanwha Q CELLS GmbH 

is not liable for improper handling of the installed parts. 

Use of the components near the sea is not permitted due to the risk of corrosion.

If handled properly and dimensioned in accordance with the static framework conditions and 
normal environmental and ambient conditions, 

Hanwha Q CELLS GmbH 

provides a 2-year 

product warranty for the service life and durability of its mounting systems. This applies in the 
context of the generally prevailing weather and environmental conditions.

Material and processing warranty: 

Hanwha Q CELLS GmbH 

provides a material and 

processing warranty of 10 years for the materials used. For more detailed information, 
please refer to the separate warranty conditions.

NOTES ON ELECTRICAL INSTALLATION

You may only carry out electrical work if you are a qualified electrician. The applicable 
DIN standards, VDE regulations, VDEW guidelines, VDN guidelines, accident prevention 
regulations and the regulations of the local electricity supply companies (EVU) are decisive 
in this context.

DIN VDE 0100 (Erection of power installations with nominal voltages up to 1000 V)

VDEW guideline for the parallel operation of in-house generation plants on the low-
voltage grid of the power supply company

VDI 6012 Guideline for decentralised energy systems in buildings: Photovoltaics

Leaflet on the VDEW Guideline "Distributed power generating plants connected to the 
low-voltage grid"

VDN guideline "Distributed power generating plants connected to the low-voltage grid"

DIN/VDE regulations, DIN/VDE 0100 "Erection of power installations with rated voltages 
up to 1000 V", in particular VDE 0100 Part 410 "Protection against direct and indirect 
contact" (DC voltages > 120 V, < 1000 V DC) and the "Accident prevention regulations of 
the industrial employers' liability insurance associations" VBG4 "Electrical installations and 
operating equipment"

DIN VDE 0100-540 Selection and installation – Earthing, protective conductors and 
equipotential bonding conductors

VDE 0185 Establishment of a lightning protection system and VDS 2010

Summary of Contents for Q.MOUNT

Page 1: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 1 Q MOUNT INSTALLATION INSTRUCTIONS TILED ROOFS...

Page 2: ...for the Q MOUNT corrugated sheet metal bridges their attachment to the roof substructure and the installation of the girder profiles and modules SAFETY INFORMATION The corrugated sheet metal bridges...

Page 3: ...ce a year an inspection and maintenance of the installed pitched roof system components and the roof cladding is carried out At least the following points should be checked all mechanical connections...

Page 4: ...ts mounting systems This applies in the context of the generally prevailing weather and environmental conditions Material and processing warranty Hanwha Q CELLS GmbH provides a material and processing...

Page 5: ...t observe the currently valid rules of construction engineering in particular the requirements formulated in the DIN standards and in the regulations of the German roofing trade Regelwerk des Deutsche...

Page 6: ...ofs 6 ROOF HOOK INSTALLATION TILE PLAIN TILE SLATE Note The clamping ranges and the resulting loads are specified in the installation instructions for the modules used Do not use the roof hooks and gi...

Page 7: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 7 REQUIRED TOOLS Cordless screwdriver with bits WS8 hexagon 6 Torque wrench Measuring tape Chalk line Allen key WS6 Spirit level...

Page 8: ...n tile slate Module type framed modules Module orientation vertical horizontal Max module field length 12 m Roof pitch 10 65 Connection Plate head screws Material Aluminium EN AW 6063 stainless steel...

Page 9: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 9 VERTICAL MODULE MOUNTING SINGLE LAYER End clamp Middle clamp Roof hook AL13 ALS13 Girder profile 37 45 65 Profile connector 37 45 65...

Page 10: ...ck end clamp Q MOUNT Click middle clamp with PIN Q MOUNT Click end clamp with PIN Q MOUNT shim Q MOUNT Sheet metal tile Q MOUNT Roof hook AL13 X Q MOUNT Plate head screw Q MOUNT Cross connector Q MOUN...

Page 11: ...in horizontal and vertical direction to the roof tile of 3 5 mm each The roof hook must never rest directly on the tile surface 3 5 mm distance To maintain the correct distance use the adjustment pos...

Page 12: ...ly supported Level out any unevenness with the spacer plate Use additional rafters or counter battens or wooden boards to ensure a full surface of the base plate option 1 2 3 Ensure that the base plat...

Page 13: ...e roof hook green plate of the roof hook the thickness of the counter battening the height of the thermal insulation and the 60 mm anchoring depth in the rafter Length of the wood screw incl upper thr...

Page 14: ...r roof hooks 4 If necessary flatten the edge slightly towards the bottom 5 Glue the foam wedge and cut it as described in the separate instructions 6 Fit the roof hooks 7 Cover with tiles 8 Mould in l...

Page 15: ...d upstand forward if necessary water lifting edge must remain functional 4 Glue on foam wedge and cut as per separate instructions 5 Mount roof hooks 6 Cover the roof with tiles Important note Already...

Page 16: ...cording to the following instructions Replace the roof tile located above the roof hook Make sure that the roof is watertight Fix the girder profiles on the mounting plate with the right side up Screw...

Page 17: ...tand forward if necessary water lifting edge must remain functional 4 Glue on foam wedge and cut as per separate instructions 5 Mount roof hooks 6 Cover the roof with tiles Important note Already when...

Page 18: ...y with the regulations and rules of the German roofing trade If necessary leave out the slate roof tiles and use a titanium zinc sheet to seal the adjacent slate roof tiles and seal it with a sealing...

Page 19: ...lfway into the first girder profile and insert the second girder profile onto the profile connector If necessary screw the profiles to the profile connector Press the end caps into the end of the gird...

Page 20: ...nd slide the end clamp to the module frame When the clamp is in the correct position tighten the clamp Tighten the screw on the middle clamp with a torque of 15 Nm Slide the next modules back to the m...

Page 21: ...profile on at least two fixing points roof hooks Do not assemble the girder profiles until you are at the assembly site e g on the roof Do not transport assembled girder profiles vertically The joint...

Page 22: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 22 VERTICAL MODULE MOUNTING CROSS CONNECTION End clamp Middle clamp Roof hook AL13 X Girder profile 37 45 65 Profile connector 37 45 65 Cross connector...

Page 23: ...girder profile with the correct side on the quick mounting adapter of the roof hook And fasten the girder profile with the Allen screw perpendicular to the eaves with a torque of 15 Nm Make sure that...

Page 24: ...the ends of the girder profiles Connect girder profiles necessary if the width of the module field is greater than the length of the girder profile Insert the profile connector halfway into the first...

Page 25: ...MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 25 HORIZONTAL MODULE MOUNTING CROSS CONNECTION End clamp Middle clamp Roof hook AL13 ALS13 Girder profile 37 45 65 Profile connector 37 45 65 Cross connecto...

Page 26: ...lfway into the first girder profile and insert the second girder profile onto the profile connector If necessary screw the profiles to the profile connector Press the end caps into the end of the gird...

Page 27: ...e clamping areas and the associated static loads in the corresponding installation instructions for the solar modules being installed Place the girder profile on the cross connector with the correct s...

Page 28: ...er to the relevant module clamping areas and the associated static loads in the corresponding installation instructions for the solar modules being installed MOUNTING SOLAR MODULES Place the lowest mo...

Page 29: ...nd slide the end clamp to the module frame When the clamp is in the correct position tighten the clamp Tighten the screw on the middle clamp with a torque of 15 Nm Slide the next modules back to the m...

Page 30: ...rofile on at least two fixing points roof hooks Do not assemble the girder profiles until you are at the assembly site e g on the roof Do not transport assembled girder profiles vertically The joints...

Page 31: ...ire into the wire clamp and fix it by tightening the screw In this way all module rows of a module field are conductively interconnected To properly secure the module cables either to the frame sides...

Page 32: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 32 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...

Page 33: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 33 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...

Page 34: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 34 Specifications subject to technical changes Q CELLS Q_CELLS_Installation_manual_Q MOUNT_Tiled_Roofs_2020 12_Rev01_EN...

Reviews: