Q.MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs
4
WARRANTY AND NOTES
WARRANTY/PRODUCT LIABILITY (EXCLUSION)
The dimensioning notes contained in this manual are merely practical tips. Binding assembly
rack statics can be created using the program
Q CELLS ROOFTOP PLANNER
.
As an installation company, you are responsible for the correct execution of the installation.
Hanwha Q CELLS GmbH
is not liable for the dimensioning information contained in
commercial plant quotations.
As an installation company, you are responsible for the mechanical durability of the mounted
interface connections on the building envelope, and especially for their tightness.
The components supplied by
Hanwha Q CELLS GmbH
are designed for this purpose
in accordance with the expected loads and the current state of the art. In this context,
you must specify all general technical conditions in writing in the project registration form
(details of the supporting structure, snow load zone, building heights, wind loads, etc.)
within the framework of the inquiry/order sent to
Hanwha Q CELLS GmbH
.
Hanwha Q CELLS GmbH
is not liable for improper handling of the installed parts.
Use of the components near the sea is not permitted due to the risk of corrosion.
If handled properly and dimensioned in accordance with the static framework conditions and
normal environmental and ambient conditions,
Hanwha Q CELLS GmbH
provides a 2-year
product warranty for the service life and durability of its mounting systems. This applies in the
context of the generally prevailing weather and environmental conditions.
Material and processing warranty:
Hanwha Q CELLS GmbH
provides a material and
processing warranty of 10 years for the materials used. For more detailed information,
please refer to the separate warranty conditions.
NOTES ON ELECTRICAL INSTALLATION
You may only carry out electrical work if you are a qualified electrician. The applicable
DIN standards, VDE regulations, VDEW guidelines, VDN guidelines, accident prevention
regulations and the regulations of the local electricity supply companies (EVU) are decisive
in this context.
DIN VDE 0100 (Erection of power installations with nominal voltages up to 1000 V)
VDEW guideline for the parallel operation of in-house generation plants on the low-
voltage grid of the power supply company
VDI 6012 Guideline for decentralised energy systems in buildings: Photovoltaics
Leaflet on the VDEW Guideline "Distributed power generating plants connected to the
low-voltage grid"
VDN guideline "Distributed power generating plants connected to the low-voltage grid"
DIN/VDE regulations, DIN/VDE 0100 "Erection of power installations with rated voltages
up to 1000 V", in particular VDE 0100 Part 410 "Protection against direct and indirect
contact" (DC voltages > 120 V, < 1000 V DC) and the "Accident prevention regulations of
the industrial employers' liability insurance associations" VBG4 "Electrical installations and
operating equipment"
DIN VDE 0100-540 Selection and installation – Earthing, protective conductors and
equipotential bonding conductors
VDE 0185 Establishment of a lightning protection system and VDS 2010
Summary of Contents for Q.MOUNT
Page 1: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 1 Q MOUNT INSTALLATION INSTRUCTIONS TILED ROOFS...
Page 32: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 32 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...
Page 33: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 33 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...