Q.MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs
29
MOUNTING SOLAR MODULES
Click the clamps into the girder profile at a slight angle as shown and push the clamp up to
the module frame. When the clamp and the second module are in the correct position,
tighten the clamp. Tighten the screw on the middle clamp with a torque of 15 Nm.
Click the centre clamps into the girder profile at a slight angle as shown and slide the end
clamp to the module frame. When the clamp is in the correct position, tighten the clamp.
Tighten the screw on the middle clamp with a torque of 15 Nm . Slide the next modules
back to the middle clamp.
Start in the lowest module row by placing the first solar module on the girder profiles and
aligning it. Place the end clamp on the module frame and click it into the girder profile.
When the clamp is in the correct position, tighten the clamp.
Middle/end clamp
min. 20 mm
Note: The middle/end clamps must be installed at least 20 mm from the end of the
corresponding girder profiles.
15 Nm
15 Nm
Summary of Contents for Q.MOUNT
Page 1: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 1 Q MOUNT INSTALLATION INSTRUCTIONS TILED ROOFS...
Page 32: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 32 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...
Page 33: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 33 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...