Q.MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs
27
•
Screw the cross connector into the upper profile channel of the base girder profile and insert
the Allen screw with the threaded plate into the upper channel as well.
•
Align the cross connector and tighten the Allen screw with a torque of 15 Nm.
NOTE: If the base girder profiles are mounted parallel to the ridge, the girder profile screw of
the cross connector must always be aligned upwards (towards the ridge).
Note: Please refer to the relevant module clamping areas and the associated static loads in
the corresponding installation instructions for the solar modules being installed.
•
Place the girder profile on the cross connector with the correct side facing upwards and
align. Tighten the Allen screw with a torque of 15 Nm.
•
When loosening and tightening the screw several times, make sure that the threaded plate
is correctly aligned (across the profile channel).
FASTENING THE GIRDER PROFILES
TO THE ROOF HOOK AND CROSS CONNECTION
Start by placing the first solar module on the girder profile and aligning it. Place the end
clamp on the module frame and click it into the girder profile. When the clamp is in the
correct position, tighten the clamp.
Summary of Contents for Q.MOUNT
Page 1: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 1 Q MOUNT INSTALLATION INSTRUCTIONS TILED ROOFS...
Page 32: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 32 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...
Page 33: ...Q MOUNT INSTALLATION INSTRUCTIONS Tiled Roofs 33 POTENTIAL EQUALISATION OPTIONS FOR TILED ROOF...